A document that defines the requirements and objectives of design activities for SCIRT's reconstruction of the city's horizontal infrastructure and describes how these activities should be implemented.
A plan which describes how SCIRT will carry out design work. The first version of this plan was produced on 1 September 2011.
A submission produced by the consultancies for the ACENZ Innovate NZ Awards of Excellence 2016, providing details about how the design team supporting SCIRT was formed, and how successful design delivery was achieved.
A guideline to inform designers on the design of an Automated Flushing Siphon System as a means to reduce the frequency of blockages on the wastewater network caused by pipe dips and flat grades.
Photo manual and guide provided to design and delivery teams at SCIRT.
A report reviewing pipe installation specifications and recommending alternatives that could improve standard specifications.
A document which outlines the purpose and processes associated with ECI at SCIRT.
A plan which describes how SCIRT will manage the coordination of utility authority liaison and utility relocation or protection during the design and construction phases of the rebuild schedule. The first version of this plan was produced on 15 November 2011.