A building on St Asaph Street has been demolished, exposing the interior structure of the adjoining building. The photographer comments, "The building that this one was part of has been demolished and the join looks very much like the exterior walls of an Anglo-Saxon house. It has been exposed due to the demolition of damaged buildings after the Christchurch earthquake".
Being demolished.
Photo outside of Pegasus Building with Copthorne Hotel fully demolished taken by Mike Gaudin, 10 January 2012.
Photo outside of Pegasus Building with Copthorne Hotel fully demolished taken by Mike Gaudin, 10 January 2012.
Photo outside of Pegasus Building with Copthorne Hotel fully demolished taken by Mike Gaudin, 10 January 2012.
A partially demolished building on Durham Street. The side wall has been demolished, exposing the inside space. A digger sits amongst the rubble.
An empty section left after a building was demolished.
The old New Brighton Power Boat Club building was badly damaged in the February 2011 earthquake, and is only now (July 2012) being demolished. The building is just down the road from where I grew up and is a New Brighton iconic building.
The old New Brighton Power Boat Club building was badly damaged in the February 2011 earthquake, and is only now (July 2012) being demolished. The building is just down the road from where I grew up and is a New Brighton iconic building.
Building rubble from a partially-demolished building is piled behind and partly against a large display window.
A digitally manipulated image of a direction signpost, with every sign pointing to parking. The photographer comments, "With around 70% of the buildings to be demolished in the CBD, Christchurch, New Zealand will be the biggest parking lot in the world for a few years".
A dawn sky reflected on the partially-demolished PricewaterhouseCoopers building.
A brick wall with flaked paint. The adjourning building has been demolished.
Building rubble from part of the Terrace on the Park apartment complex. Two buildings in the complex required urgent demolition, and the other buildings in the complex will eventually be demolished.
Building rubble from part of the Terrace on the Park apartment complex. Two buildings in the complex required urgent demolition, and the other buildings in the complex will eventually be demolished.
Corner of Cashel and Colombo Streets, looking towards the partially-demolished Westpac building.
Two excavators and building rubble beside the Terrace on the Park apartment complex. Two buildings in the complex required urgent demolition, and the other buildings in the complex will eventually be demolished.
Two excavators and building rubble beside the Terrace on the Park apartment complex. Two buildings in the complex required urgent demolition, and the other buildings in the complex will eventually be demolished.
A crane holds a shipping container against a building while it is being demolished.
A crane holds a shipping container against a building while it is being demolished.
Two buildings in the Terrace on the Park apartment complex required urgent demolition, and the other buildings in the complex will eventually be demolished.
Two excavators and building rubble in front of the Terrace on the Park apartment complex. Two buildings in the complex required urgent demolition, and the other buildings in the complex will eventually be demolished.
Two excavators and building rubble in front of the Terrace on the Park apartment complex. Two buildings in the complex required urgent demolition, and the other buildings in the complex will eventually be demolished.
An excavator demolishes a building. Cabling has been exposed and hangs from the concrete beams.
The Canterbury Earthquake Recovery Authority's chief executive, Roger Sutton.
The Triton Dairy has reopened in a container on the site of its demolished former building.
A view through a gap in the partially-demolished Crowne Plaza Hotel to the Forsyth Barr building.
Fletcher hazard board outside the Terrace on the Park apartment complex where two buildings have been demolished.
Two excavators in front of the Terrace on the Park apartment complex. Two buildings in the complex required urgent demolition, and the other buildings in the complex will eventually be demolished.
Two excavators in front of the Terrace on the Park apartment complex. Two buildings in the complex required urgent demolition, and the other buildings in the complex will eventually be demolished.