Search

found 14 results

Images, UC QuakeStudies

A small wooden cross is inserted between stones laid out in the shape of a large cross. The photographer comments, "This is an Earthquake Memorial on Manchester Street, Christchurch, New Zealand. This message is on the tree next to the memorial: 'Earthquake Memorial. 185 people died as a result of the 22 February 2011 earthquake. 185 precious lives are remembered here, with 185 pieces of Halswell stone recovered from St Luke's Church, damaged beyond repair on that day. May they rest in peace. St Luke's in the City'".

Research papers, University of Canterbury Library

The Mw 7.1 Darfield earthquake generated a ~30 km long surface rupture on the Greendale Fault and significant surface deformation related to related blind faults on a previously unrecognized fault system beneath the Canterbury Plains. This earthquake provided the opportunity for research into the patterns and mechanisms of co-seismic and post-seismic crustal deformation. In this thesis I use multiple across-fault EDM surveys, logic trees, surface investigations and deformation feature mapping, seismic reflection surveying, and survey mark (cadastral) re-occupation using GPS to quantify surface displacements at a variety of temporal and spatial scales. My field mapping investigations identified shaking and crustal displacement-induced surface deformation features south and southwest of Christchurch and in the vicinity of the projected surface traces of the Hororata Blind and Charing Cross Faults. The data are consistent with the high peak ground accelerations and broad surface warping due to underlying reverse faulting on the Hororata Blind Fault and Charing Cross Fault. I measured varying amounts of post-seismic displacement at four of five locations that crossed the Greendale Fault. None of the data showed evidence for localized dextral creep on the Greendale Fault surface trace, consistent with other studies showing only minimal regional post-seismic deformation. Instead, the post-seismic deformation field suggests an apparent westward translation of northern parts of the across-fault surveys relative to the southern parts of the surveys that I attribute to post-mainshock creep on blind thrusts and/or other unidentified structures. The seismic surveys identified a deformation zone in the gravels that we attribute to the Hororata Blind Fault but the Charing Cross fault was not able to be identified on the survey. Cadastral re-surveys indicate a deformation field consistent with previously published geodetic data. We use this deformation with regional strain rates to estimate earthquake recurrence intervals of ~7000 to > 14,000 yrs on the Hororata Blind and Charing Cross Faults.

Audio, Radio New Zealand

The National Recovery Coordinator for Red Cross Emergency Services in Australia, who has researched disaster recovery practices around the world including the aftermath of the September 11 attacks, London bombings and Sichuan earthquake. She is visiting New Zealand ahead of the first anniversary of the February earthquake in Christchurch.

Images, UC QuakeStudies

A digitally manipulated image of a high-reach excavator demolishing a building. The photographer comments, "After the earthquakes in Christchurch, New Zealand the demolition of most of the City Centre began. After two years the government thought that the progress was far too slow, so began the start of the automatic demolition. Luckily when the solar powered demolition machines started to cause indiscriminate death and destruction they were isolated to the South Island and unable to cross the seas".

Images, Alexander Turnbull Library

The top frame shows the barbed wire and watch tower of a prison. There is a comment about someone wanting the warmth of a prison cell. The second frame shows prison staff chatting at cross purposes about a petition from Christchurch with homes wrecked by earthquake pleading to be allowed to live in prison and the sentence imposed on the Bridgecorp directors who have been accused of defrauding investors. Colour and black and white versions available Quantity: 2 digital cartoon(s).

Images, Alexander Turnbull Library

Shows Minister for Christchurch Earthquake Recovery Gerry Brownlee as Pontius Pilate washing his hands of the rental crisis in Christchurch. In the background is Jesus burdened with the cross and representing the 'rental crisis'. Context: The rental housing situation in Christchurch is at crisis point and is causing huge stress for people unable to find suitable accommodation. Earthquake Recovery Minister Gerry Brownlee said last month that the rental housing crisis was best left to the market, but Gatonyi said his stance was "totally flawed". (Press 12 April 2012) Quantity: 1 digital cartoon(s).

Images, UC QuakeStudies

Digitally manipulated image of graffiti on a brick building on St Asaph Street. The graffiti depicts a sticking plaster over a broken section of the wall, with the words "I'll kiss it better". The photographer comments, "After the 22 February 2011 earthquake in Christchurch band aid plasters starting to appear in different parts of the city on damaged buildings. A year later most can still be seen. This one was once a whole plaster, but it has slowly broken up where it crossed the gap. The red bricks seen to symbolise the terrible wounds caused to the City and it's people".

Images, Alexander Turnbull Library

Under the caption 'Best value for money?' is a football stadium displaying a red cross. From within a voice proclaims the advantages of having a combined covered stadium, hospital and blood bank. Under CERA, the Christchurch Central Development Unit had planned for a covered sports stadium, with attached facilities and shops as one of the key sites in the Christchurch rebuild after the 2010 and 2011 earthquakes. The 'blood bin' refers to the recent practice in rugby of sending off players with flesh wounds. There were also plans for a new hospital. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

Depending on their nature and severity, disasters can create large volumes of debris and waste. Waste volumes from a single event can be the equivalent of many times the annual waste generation rate of the affected community. These volumes can overwhelm existing solid waste management facilities and personnel. Mismanagement of disaster waste can affect both the response and long term recovery of a disaster affected area. Previous research into disaster waste management has been either context specific or event specific, making it difficult to transfer lessons from one disaster event to another. The aim of this research is to develop a systems understanding of disaster waste management and in turn develop context- and disaster-transferrable decision-making guidance for emergency and waste managers. To research this complex and multi-disciplinary problem, a multi-hazard, multi-context, multi-case study approach was adopted. The research focussed on five major disaster events: 2011 Christchurch earthquake, 2009 Victorian Bushfires, 2009 Samoan tsunami, 2009 L’Aquila earthquake and 2005 Hurricane Katrina. The first stage of the analysis involved the development of a set of ‘disaster & disaster waste’ impact indicators. The indicators demonstrate a method by which disaster managers, planners and researchers can simplify the very large spectra of possible disaster impacts, into some key decision-drivers which will likely influence post-disaster management requirements. The second stage of the research was to develop a set of criteria to represent the desirable environmental, economic, social and recovery effects of a successful disaster waste management system. These criteria were used to assess the effectiveness of the disaster waste management approaches for the case studies. The third stage of the research was the cross-case analysis. Six main elements of disaster waste management systems were identified and analysed. These were: strategic management, funding mechanisms, operational management, environmental and human health risk management, and legislation and regulation. Within each of these system elements, key decision-making guidance (linked to the ‘disaster & disaster waste’ indicators) and management principles were developed. The ‘disaster & disaster waste’ impact indicators, the effects assessment criteria and management principles have all been developed so that they can be practically applied to disaster waste management planning and response in the future.

Audio, Radio New Zealand

DAVID SHEARER to the Prime Minister: Does he stand by his statement: “I’m not going to go and relitigate every comment I’ve made prior to this point because I don’t think that would actually be helpful”? TODD McCLAY to the Minister of Finance: How has the Government balanced the need for responsible fiscal management with its continued support for New Zealand families? METIRIA TUREI to the Prime Minister: Ka whakatau a ia i te kōrero i whakaputaina māna, arā, “I do not accept the view that we are a deeply unequal country. I do not think the evidence suggests that, and people drawing that conclusion are wrong”? Translation: Does he stand by the statement made on his behalf, “I do not accept the view that we are a deeply unequal country. I do not think the evidence suggests that, and people drawing that conclusion are wrong”? JACQUI DEAN to the Minister for Canterbury Earthquake Recovery: What recent announcements has the Government made around the rebuild of the Christchurch city centre? Hon PAREKURA HOROMIA to the Minister of Māori Affairs: Does he stand by all his statements? MAGGIE BARRY to the Minister of Health: Has any progress been made on the Zero Fees for Under Sixes scheme taking coverage over and above the 70 percent of children covered in 2008 achieved by the previous Government? Hon TREVOR MALLARD to the Associate Minister of Education: What progress has been made on the charter schools policy? ALFRED NGARO to the Minister for Social Development: What announcements has she made on the release of the White Paper for Vulnerable Children? CLARE CURRAN to the Minister of Transport: Does he stand by his statement in his press release of 24 May 2012 that “KiwiRail has successfully undertaken a significant investment programme over the previous two years, including: New locomotives and wagons, and refurbishment of the current locomotive fleet”? Rt Hon WINSTON PETERS to the Minister of Finance: Does he stand by the statement made on his behalf that there are no plans to sell KiwiRail? MELISSA LEE to the Minister for Ethnic Affairs: What reports has she received about the Office of Ethnic Affairs working with the Red Cross? JULIE ANNE GENTER to the Minister of Transport: What alternatives did the Government investigate before committing itself to the Road of National Significance between Puhoi and Wellsford, which is now projected to cost $1.76 billion up from $1.69 billion two years ago?