Central City Utilities Coordination
Articles, UC QuakeStudies
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A presentation which explains that NZTA have adopted SCIRT's approach to utilities management and sets out the reasons why. This presentation was created in 2015.
A document which stipulates SCIRT's minimum standard for managing the risks arising from working around services.
A management plan which describes how SCIRT will coordinate utility authorities and utility relocations.
A document which describes the processes and procedures SCIRT designers and delivery teams had to follow to locate and protect utilities.
A bowtie diagram which SCIRT used to evaluate the risks associated with and analyse the causal relationships associated with service strikes.
A document which contains several examples of SCIRT Safety Alerts, which were documents sent out to inform and educate all site staff after an incident.
A document which describes how SCIRT led the co-ordination of its huge repair programme with those of other utilities.
A document which contains a set of procedures for the "best practice" mark out and recording of subsurface utilities.
A diagram created in 2011, showing the communication structure across rebuild agencies.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A plan which describes how SCIRT will manage the coordination of utility authority liaison and utility relocation or protection during the design and construction phases of the rebuild schedule. The first version of this plan was produced on 15 November 2011.
A video of the keynote presentation by Sir John Holmes, during the first plenary of the 2016 People in Disasters Conference. Holmes is the former United Nations Under-Secretary-General for Humanitarian Affairs and Emergency Relief Coordinator, the current Director of Ditchley Foundation, and the chair of the Board of the International Rescue Committee in the UK. The presentation is titled, "The Politics of Humanity: Reflections on international aid in disasters".The abstract for this presentation reads as follows: As United Nations Under-Secretary-General for Humanitarian Affairs and Emergency Relief Coordinate from 2007-2010, Sir John Holmes was heavily involved in the coordination of air provision to countries struck by natural and man-made disasters, raising the necessary funds, and the elaboration of humanitarian policy. The international humanitarian system is fragmented and struggling to cope with rising demands from both conflicts such as that in Syria, and the growing effects of climate change. Sir John will talk about what humanitarian aid can and cannot achieve, the frustrations of getting aid through when access may be difficult or denied, and the need to ensure that assistance encompasses protection of civilians and efforts to get them back on their feet, as well as the delivery of essential short term items such as food, water, medical care and shelter. He will discuss the challenges involved in trying to make the different agencies - UN United Nations, non-government organisations and the International Red Cross/Crescent movement - work together effectively. He will reveal some of the problems in dealing with donor and recipient governments who often have their own political and security agendas, and may be little interested in the necessary neutrality and independence of humanitarian aid. He will illustrate these points by practical examples of political and other dilemmas from aid provision in natural disasters such as Cyclone Nargis in Myanmar in 2009, and the Haiti earthquake of 2010, and in conflict situations such as Darfur, Afghanistan and Sri Lanka in the past, and Syria today. He will also draw conclusions and make recommendations about how humanitarian aid might work better, and why politicians and others need to understand more clearly the impartial space required by humanitarian agencies to operate properly.