A pdf copy of a drawing for children focusing on diggers and road cones.
Looking through the fence of a construction site where some ground foundation has been laid down. The heading on the sign on the fence says 'Caution. Construction Site. Authorised Personnel Only'.
A sign on a wire fencing around a construction site reading, "Quake repairs, keep out, for your own safety".
The Kaiapoi New World construction site.
The Kaiapoi New World construction site.
Hawkins Construction site office on Creyke Road.
Wood and bricks on Canterbury Street in Lyttelton. This construction material has been stripped from the house behind. To the right is a digger.
A photograph of a construction site near the intersection of Black Street and Raven Quay in Kaiapoi.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. There is a portacom on the site, and construction material is leaning against the mural.
Two years on from the February twenty second earthquake, large parts of Christchurch Hospital are a construction site as repairs to damaged wards continue.
Wood and pink insulation batts on Canterbury Street in Lyttelton. This construction material has been stripped from the exterior of a house.
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
Construction materials outside a house on Canterbury Street in Lyttelton. The house is being demolished after the 22 February 2011 earthquake. Wire fencing and road cones cordon off the area, and a bulldozer and a digger are parked on the road.
A photograph captioned by BeckerFraserPhotos, "A de-construction worker on the MFL House site".
A photograph of construction near the site of the Crowne Plaza, corner of Kilmore, Durham and Victoria Streets.
A photograph of construction near the site of the Crowne Plaza, corner of Kilmore, Durham and Victoria Streets.
A photograph of construction near the site of the Crowne Plaza, corner of Kilmore, Durham and Victoria Streets.
A empty site in Bexley where a house once stood. The foundations for the house can still be seen. A sign reading, 'Danger construction site' hangs on the security fence that surrounds the area.
A construction site where some ground foundation has been laid down. In the background is a damaged brick property.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Construction material has been laid up against the mural.
Construction equipment parked on the former site of the Oxford on Avon, seen through the cordon fencing around Victoria Square.
An aerial photograph of Madras Street near Latimer Square, with the Transitional Cathedral under construction.
A demolition site where loose cables hang from the roof. Construction workers and a digger can be seen behind the rubble.
A demolition site where loose cables hang from the roof. Construction workers and a digger can be seen behind the rubble.
Furniture made of recycled wood situated in an empty construction site. The furniture was part of the Gap Filler project.
A construction site on Wakefield Avenue in Sumner that has been red-stickered due to rock fall danger from the cliff behind it.
A construction site on Wakefield Avenue in Sumner that has been red-stickered due to rock fall danger from the cliff behind it.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Sections of reinforcing steel and other construction material have been laid up against the mural.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. A skip, several pallets, and other construction material have been placed in front of the mural.
A photograph of the construction of Illusions taking place on an empty site on Gloucester street. The installation is part of LUXCITY.