Latimer Hotel, Latimer Square, Christchurch File reference: CCL-2012-04-06-LatimerSquare-April-2012-DSC_0861.JPG From the collection of Christchurch City Libraries.
Photograph captioned by BeckerFraserPhotos, "New construction starts at 75 Manchester Street".
Construction work seen from Gloucester Street.
Looking through the fence of a construction site where some ground foundation has been laid down. The heading on the sign on the fence says 'Caution. Construction Site. Authorised Personnel Only'.
Page 4 of Section A of the Christchurch Press, published on Saturday 18 August 2012.
A PDF copy of The Star newspaper, published on Friday 21 September 2012.
Hawkins Construction site office on Creyke Road.
Page 3 of Section C of the Christchurch Press, published on Saturday 15 September 2012.
Page 1 of Section A of the South Island edition of the Christchurch Press, published on Wednesday 27 June 2012.
A photograph of a Leighs Construction sign on Manchester Street.
Volunteers tying down cables during the construction of the Pallet Pavilion.
A digitally manipulated image of diggers sitting on top of rubble beside the old Railway Station. The photographer comments, "Which one will be buried 6 foot under?".
Building construction in Edgeware. This will soon house a SuperValue supermarket.
Page 2 of Section A of the Christchurch edition of the Christchurch Press, published on Thursday 9 August 2012.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
Volunteers standing on top of pallets during the construction of the Pallet Pavilion.
Photograph captioned by BeckerFraserPhotos, "The EPIC construction office, 100 Manchester Street".
A video of architect Shigeru Ban overseeing the construction of the cardboard beams which will be used to build the Transitional Cathedral on Hereford Street. The video includes an interview with Ban about the beams, and the ways that the design has changed since the construction started.
A video of an interview with Wendy Rushworth, whose house was fenced off despite not being scheduled for demolition. Falcon Construction accidently added Rushworth's property to a list of homes ready for demolition. The company has since apologised to Rushworth and removed the fencing.
A construction area on Kilmore Street with a pile of rubble behind cordon fencing.
Decoration on the cordon fence. Ongoing construction work can be seen in the background.
A photograph of a partially-constructed building. The photograph is captioned by BeckerFraserPhotos, "Rebuilding, Salisbury Street".
A photograph captioned by BeckerFraserPhotos, "Workers laying a new footpath outside 540 Colombo Street".
A photograph captioned by BeckerFraserPhotos, "A new front being built on 514 Colombo Street".
A photograph of a concrete mixer. The photograph is captioned by BeckerFraserPhotos, "The old and the new in Colombo Street".
A photograph captioned by BeckerFraserPhotos, "The new car park on Colombo Street between Tuam and Lichfield Streets, with flower beds and new trees".
A photograph captioned by BeckerFraserPhotos, "Concrete being poured in a new building in Colombo Street".
A video of the first part of a series of talks on the topic of Planning and People, at the 2012 Seismics and the City forum. The talks are as follows: Mary Devine, Managing Director of Ballantyne and Co, on Anchoring Re:START and holding the centre; Anthony Leighs, Chief Executive of Leighs Construction, on Deconstruction and Reconstruction; and Sam Johnson, founder of the Student Volunteer Army, on Mobilising a Quick Response.