Latimer Hotel, Latimer Square, Christchurch File reference: CCL-2012-04-06-LatimerSquare-April-2012-DSC_0861.JPG From the collection of Christchurch City Libraries.
Photograph captioned by BeckerFraserPhotos, "New construction starts at 75 Manchester Street".
A PDF copy of The Star newspaper, published on Friday 21 September 2012.
A photograph of a Leighs Construction sign on Manchester Street.
Volunteers tying down cables during the construction of the Pallet Pavilion.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
Volunteers standing on top of pallets during the construction of the Pallet Pavilion.
Photograph captioned by BeckerFraserPhotos, "The EPIC construction office, 100 Manchester Street".
A construction area on Kilmore Street with a pile of rubble behind cordon fencing.
A photograph of a partially-constructed building. The photograph is captioned by BeckerFraserPhotos, "Rebuilding, Salisbury Street".
A photograph captioned by BeckerFraserPhotos, "Workers laying a new footpath outside 540 Colombo Street".
A photograph captioned by BeckerFraserPhotos, "A new front being built on 514 Colombo Street".
A photograph of a concrete mixer. The photograph is captioned by BeckerFraserPhotos, "The old and the new in Colombo Street".
A photograph captioned by BeckerFraserPhotos, "The new car park on Colombo Street between Tuam and Lichfield Streets, with flower beds and new trees".
A photograph captioned by BeckerFraserPhotos, "Concrete being poured in a new building in Colombo Street".
A photograph captioned by BeckerFraserPhotos, "A de-construction worker on the MFL House site".
A photograph captioned by BeckerFraserPhotos, "Crowne Plaza Hotel in the process of de-construction".
A volunteer posing in his kilt on St Andrew's Day, during the construction of the Pallet Pavilion.
A photograph of the site of the Crowne Plaza Hotel on the corner of Kilmore and Durham Streets. The hotel has been demolished into large piles of rubble which two excavators are working to clear. A sign on the cordon fence indicates that the demolition is being carried out by Grant Mackay Demolition Co. and Leigh Construction.
Photograph captioned by BeckerFraserPhotos, "New construction of residential units at the Linwood Village, 402 Worcester Street".
A photograph captioned by BeckerFraserPhotos, "Brick cladding covering up concrete slab - strong and attractive! Montreal Street".
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
An early presentation which summarises SCIRT's commercial model in a simple way.
A photograph of four architecture students working on the construction of part of the Pavilions & Lighting Devices market for LUXCITY.