Search

found 4015 results

Images, eqnz.chch.2010

Tuesday 27 March 2012. File reference: CCL-2012-03-27-IMG_0742 From the collection of Christchurch City Libraries.

Images, eqnz.chch.2010

Tuesday 27 March 2012. File reference: CCL-2012-03-27-IMG_0738 From the collection of Christchurch City Libraries.

Images, eqnz.chch.2010

Tuesday 27 March 2012. File reference: CCL-2012-03-27-IMG_0739 From the collection of Christchurch City Libraries.

Articles, UC QuakeStudies

A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.

Articles, UC QuakeStudies

A PDF copy of the site map for CityUps. CityUps was a 'city of the future for one night only', and the main event of FESTA 2014. It was held on vacant sites at the intersection of Lichfield Street, Manchester Street and High Street. Architecture students from Unitec, The University of Auckland and CPIT collaborated with local businesses to create large-scale, temporary structures to entertain the public.

Images, UC QuakeStudies

A photograph of a temporary installation titled GlowCity, which was created by students from Unitec, in partnership with Games Hall street games. GlowCity was part of CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Images, eqnz.chch.2010

Our City building extensively propped up. File reference: CCL-2011-08-12-CanterburyPublic Library pre-demolition-040 From the collection of Christchurch City Libraries.

Images, eqnz.chch.2010

Demolition (Deconstruction) of the partially pancaked multi story car park above the old Smith City building. Taken from the Moorhouse-Colombo Street flyover.

Articles, UC QuakeStudies

An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.