A document which details Downer's approach to heritage management when repairing the Armagh Street bridge.
A brochure created for Beca Heritage Week 2014, outlining SCIRT's repair work on heritage structures in the Central City. It was handed out to members of the public at SCIRT's walk and talk tours.
A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
Posters created for Beca Heritage Week 2014, outlining SCIRT's repair work on the Armagh Street and Colombo Street bridges in the Central City. They were hung on the bridges for members of the public to read during SCIRT's walk and talk tours.
Demolition work on Christchurch's "distinctive" former civic building and the Front Runner store. On a walk around Christchurch May 9, 2013 New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department s...
An interview with Chris Whitty, Site Manager at the Christchurch Arts Centre, about the recovery of the Townsend Telescope from the rubble of the Observatory tower. The interview was conducted by Sebastian Wilberforce.
Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, which...
Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, which...
On a walk around the city to catch up on what is happening May 29, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, w...
The text of a Pecha Kucha talk titled, "A working week in the Recovery Centre". The talk was given by Moya Sherrif, CCCRC Intern, at the Museums Aotearoa Conference on 4 April 2014.
A copy of Stars in a Cluster, a book by the Department of Physics and Astronomy at the University of Canterbury. The book was published in 1996 and edited by W. Tobin and G.M. Evans. This PDF version was created in 2014.
The former Government Life building in Christchurch's Cathedral Square will be demolished. On my walk around the city May 21, 2014 Christchurch New Zealand. www.stuff.co.nz/the-press/news/christch...
Demolition underway on a walk around the city to catch up on events happening June 25, 2014 Christchurch New Zealand.
Victoria Apartments demolition is under way on a walk around the city to find out what is happening in the city. Feb 17, 2014 Christchurch New Zealand. "soft-stripped", which means that any remaining belongings will be removed, as well as furnishings and internal walls.
Working at getting things out of the Victoria Square before it is demolished. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... What I found on my walk around the city January 15, 2014 Ch...
The centennial pool demolition is under way. On a walk around the city to catch up on events happening June 18, 2014 Christchurch New Zealand. Swimsuits have been hung on the fence around the Centennial Pool by campaigners against the complex's demolition. The Armagh St facility is being pulled down to make way for the new Margaret Mahy Fami...
On a walk around the city to find out of the Demolition work on the Victoria Sq Apartments. Taking up a digger it took some times to manmover it up there! Feb 17, 2014 Christchurch New Zealand. www.stuff.co.nz/the-press/ne...
After my visit at the hospital for physiotherapy on my hand I took a walk around the city on my way home. Demolition of the Victoria Square apartments February 12, 2014 Christchurch New Zealand. www.s...
Demolition of the old Millers building is just about complemented. On my walk around the city in the rain.. thought it may have stopped.. but didn't so I just kept walking! June 12, 2014 Christchurch New Zealand.
Christchurch "New Zealand" architecture building "Demolition of old Millers building" demolition detail rubbleDemolition started on the old Millers building on a walk around Christchurch May 6, 2013 New Zealand. The building was originally designed in 1935 by G. A. Hart for the retail store, factory and warehouse Millers and was completed in 19...
The centennial pool demolition is under way. On a walk around the city to catch up on events happening June 18, 2014 Christchurch New Zealand. Swimsuits have been hung on the fence around the Centennial Pool by campaigners against the complex's demolition. The Armagh St facility is being pulled down to make way for the new Margaret Mahy Fami...
I am going away for a short time for a holiday and well get back to you all when I get home. Demotion of the Victoria Sq apartments on a walk around the city Feb 26, 2014 Christchurch New Zealand. www...
The centennial pool demolition is under way. On a walk around the city to catch up on events happening June 18, 2014 Christchurch New Zealand. Swimsuits have been hung on the fence around the Centennial Pool by campaigners against the complex's demolition. The Armagh St facility is being pulled down to make way for the new Margaret Mahy Fami...
Knox Church Rebuild/ repair on a walk around the neighbourhood May 17, 2014 Christchurch New Zealand.
A document describing the early warning system to alert team members of ground and structural movement at the Arch.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A document which outlines several of Downer's safety initiatives, developed when working in the Central Business District.