Search

found 9 results

Research papers, University of Canterbury Library

In recent Canterbury earthquakes, structures have performed well in terms of life safety but the estimated total cost of the rebuild was as high as $40 billion. The major contributors to this cost are repair/demolition/rebuild cost, the resulting downtime and business interruption. For this reason, the authors are exploring alternate building systems that can minimize the downtime and business interruption due to building damage in an earthquake; thereby greatly reducing the financial implications of seismic events. In this paper, a sustainable and demountable precast reinforced concrete (RC) frame system in which the precast members are connected via steel tubes/plates or steel angles/plates and high strength friction grip (HSFG) bolts is introduced. In the proposed system, damaged structural elements in seismic frames can be easily replaced with new ones; thereby making it an easily and quickly repairable and a low-loss system. The column to foundation connection in the proposed system can be designed either as fixed or pinned depending on the requirement of strength and stiffness. In a fixed base frame system, ground storey columns will also be damaged along with beams in seismic events, which are to be replaced after seismic events; whereas in a pin base frame only beams (which are easy to replace) will be damaged. Low to medium rise (3-6 storey) precast RC frame buildings with fixed and pin bases are analyzed in this paper; and their lateral capacity, lateral stiffness and natural period are scrutinized to better understand the pros and cons of the demountable precast frame system with fixed and pin base connections.

Research papers, University of Canterbury Library

The Canterbury earthquakes, which involved widespread damage in the February 2011 event and ongoing aftershocks near the Christchurch central business district (CBD), presented decision-makers with many recovery challenges. This paper identifies major government decisions, challenges, and lessons in the early recovery of Christchurch based on 23 key-informant interviews conducted 15 months after the February 2011 earthquake. It then focuses on one of the most important decisions – maintaining the cordon around the heavily damaged CBD – and investigates its impacts. The cordon displaced 50,000 central city jobs, raised questions about (and provided new opportunities for) the long-term viability of downtown, influenced the number and practice of building demolitions, and affected debris management; despite being associated with substantial losses, the cordon was commonly viewed as necessary, and provided some benefits in facilitating recovery. Management of the cordon poses important lessons for planning for catastrophic urban earthquakes around the world.

Research papers, University of Canterbury Library

This paper presents the preliminary findings of a study on the resilience and recovery of organisations following the Darfield earthquake in New Zealand on 4 September 2010. Sampling included organisations proximal and distal to the fault trace, organisations located within central business districts, and organisations from seven diverse industry sectors. The research captured information on the challenges to, the impacts on, and the reflections of the organisations in the first months of recovery. Organisations in central business districts and in the hospitality sector were most likely to close while organisations that had perishable stock and livestock were more heavily reliant on critical services. Staff well-being, cash flow, and customer loss were major concerns for organisations across all sectors. For all organisations, the most helpful factors in mitigating the effects of the earthquake to be their relationship with staff, the design and type of buildings, and critical service continuity or swift reinstatement of services.

Research papers, Victoria University of Wellington

Urban Ensembles explores the way in which landscape and architecture can be employed together within the design of a steep, urban site. Lyttelton is a small port town on the border of Christchurch, settled in the foothills of a harbour formed by a major volcanic eruption. This rugged setting, with steeply sloping urban terrain, presents an interesting challenge when designing an urban development. The site was badly damaged in a series of earthquakes in 2010-2011, and many of the town’s oldest buildings, heritage structures dating back to the colonial settlement era, were destroyed. This has left a void in the heart of Lyttelton, and caused the loss of much of the tourism business that the town relies upon for its income. This thesis takes a methodological approach to the design of landscape architecture on such a challenging site. A range of techniques are explored, drawing from both landscape and architecture to explore the roles that each discipline plays in the design of urban spaces. The frequent imbalance between disciplines is addressed both through the literature review and design method, as this landscape architecture thesis draws on architectural design as a tool for generating spaces which fall somewhere in between the two ideals of interior and exterior. The final design proposal is an alternative rebuild plan for the central business area to the south of London St, and also addresses the relationships between that site and the surrounding context, both urban and environmental. The aim of this design is to create a series of interconnected spaces which have a strong relationship to the surrounding harbour setting, and also to facilitate development of the pedestrian spaces throughout the block and encouraging the development of activity at the street level, through the interface between buildings and landscape.