The Christchurch City Council says it needs Government money to help repair its earthquake damaged heritage and character buildings.
Fletcher Construction has won the largest building contract in New Zealand history to repair half of the Canterbury homes damaged in last month's earthquake.
The Property Council says an ultimatum from the Christchurch City Council to owners of earthquake damaged commercial buildings will add to the stress business people are already under.
The word "repairs" painted on the side of a building has a large crack running through it.
A building with temporary sheet metal weatherproofing on the roof, replacing the fallen brickwork. Scaffolding has also been erected next to the building so that repairs can be made.
In the first of two frames which represents 'now' is a row of houses in the bay; two old-style character villas flank a modern house built to look like a boat and someone inside the modern house says proudly that they 'built here because of the character of the bays'. In the second frame which represents 'soon' all of the houses have taken on the character of the modern house and someone from the original modern house can't put their finger on why they feel that 'It's not the same somehow'. Quantity: 1 digital cartoon(s).
Red stickered building means no access, and the building may be condemned if it cannot be repaired; aftermath of the magnitude 7.1 earthquake that hit Christchurch on 4 September 2010.
Yellow stickered building means restricted access, and the building will need to be repaired and certified fit for use; aftermath of the magnitude 7.1 earthquake that hit Christchurch on 4 September 2010.
Some owners of commercial buildings badly damaged in the Canterbury earthquake, have been told if they don't repair or demolish them by January the 31st, the Christchurch City Council will do it for them.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
While it's going to take several years and millions of dollars to repair earthquake damage, the Christchurch Arts Centre can count its lucky stars and look ahead to making the historic building better and stronger.
Photograph captioned by Fairfax, "Furniture maker Bertram Rush and his building survived the earthquake. He's still open, hearing from people with damaged cabinets, and has been busy helping a customer to repair his home".
Steel frames are being used to shore the unstable facade of the St John the Baptist Church at Latimer Square while the building is being repaired and strengthened following the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Foyer lifts etc. Female toilets are off the foyer to the left. These lifts start at Level 2 of the Library, and are heavily used by students. (Once the building is repaired after the earthquake; several floors are still in a mess)".