NicksPlace Photograph 188
Images, UC QuakeStudies
The word "repairs" painted on the side of a building has a large crack running through it.
The word "repairs" painted on the side of a building has a large crack running through it.
A building with temporary sheet metal weatherproofing on the roof, replacing the fallen brickwork. Scaffolding has also been erected next to the building so that repairs can be made.
The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Foyer lifts etc. Female toilets are off the foyer to the left. These lifts start at Level 2 of the Library, and are heavily used by students. (Once the building is repaired after the earthquake; several floors are still in a mess)".