A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
A document which details Downer's approach to heritage management when repairing the Armagh Street bridge.
Posters created for Beca Heritage Week 2014, outlining SCIRT's repair work on the Armagh Street and Colombo Street bridges in the Central City. They were hung on the bridges for members of the public to read during SCIRT's walk and talk tours.
A web story about a site visit to the Bridge and Arch by local school pupils.
A web story about the model design work by Christ's College pupils.
A brochure created for Beca Heritage Week 2014, outlining SCIRT's repair work on heritage structures in the Central City. It was handed out to members of the public at SCIRT's walk and talk tours.
A document describing the confined spaces "dummy run".
A document describing Downer's approach to containing bentonite when drilling micro piles for the new Arch foundations.
A document describing the use of 3D modelling for construction methodology.
A document describing the early warning system to alert team members of ground and structural movement at the Arch.
A document describing the use of a remotely operated hydraulic jaw crusher to avoid the need to make confined space entries.
A document describing Downer's planned approach for neutralising the high pH of any potential bentonite or grout discharge into the Avon river.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.