Search

found 14 results

Articles, UC QuakeStudies

An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.

Research papers, University of Canterbury Library

Asset management in power systems is exercised to improve network reliability to provide confidence and security for customers and asset owners. While there are well-established reliability metrics that are used to measure and manage business-as-usual disruptions, an increasing appreciation of the consequences of low-probability high-impact events means that resilience is increasingly being factored into asset management in order to provide robustness and redundancy to components and wider networks. This is particularly important for electricity systems, given that a range of other infrastructure lifelines depend upon their operation. The 2010-2011 Canterbury Earthquake Sequence provides valuable insights into electricity system criticality and resilience in the face of severe earthquake impacts. While above-ground assets are relatively easy to monitor and repair, underground assets such as cables emplaced across wide areas in the distribution network are difficult to monitor, identify faults on, and repair. This study has characterised in detail the impacts to buried electricity cables in Christchurch resulting from seismically-induced ground deformation caused primarily by liquefaction and lateral spread. Primary modes of failure include cable bending, stretching, insulation damage, joint braking and, being pulled off other equipment such as substation connections. Performance and repair data have been compiled into a detailed geospatial database, which in combination with spatial models of peak ground acceleration, peak ground velocity and ground deformation, will be used to establish rigorous relationships between seismicity and performance. These metrics will be used to inform asset owners of network performance in future earthquakes, further assess component criticality, and provide resilience metrics.

Research papers, University of Canterbury Library

The Canterbury earthquakes of 2010 and 2011 have shone the spotlight on a number of tax issues. These issues, and in particular lessons learned from them, will be relevant for revenue authorities, policymakers and taxpayers alike in the broader context of natural disasters. Issues considered by this paper include the tax treatment of insurance monies. For example, building owners will receive pay-outs for destroyed assets and buildings which have been depreciated. Where the insurance payment is more than the adjusted tax value, there will be a taxable "gain on sale" (or depreciation recovery income). If the building owner uses those insurance proceeds to purchase a replacement asset, legislative amendments specifically enacted following the earthquakes provide that rollover relief of the depreciation recovery income is available. The tax treatment of expenditure to seismically strengthen a building is another significant issue faced by building owners. Case law has determined that this expenditure will usually be capital expenditure. In the past such costs could be capitalised to the building and depreciated accordingly. However, since the 2011-2012 income year owners have been prohibited from claiming depreciation on buildings and therefore currently no deduction is available for such strengthening expenditure (whether immediate or deferred). This has significant potential implications for landlords throughout New Zealand facing significant seismic retrofit costs. Incentives, or some form of financial support, whether delivered through the tax system or some other mechanism may be required. International Financial Reporting Standards (IFRS) require insurance proceeds, including reimbursement for expenditure of a capital nature, be reported as income while expenditure itself is not recorded as a current period expense. This has the effect of overstating current income and creating a larger variation between reported income for accounting and taxation purposes. Businesses have obligations to maintain certain business records for tax purposes. Reconstructing records destroyed by a natural disaster depends on how the information was originally stored. The earthquakes have demonstrated the benefits of ‘off-site’ (outside Canterbury) storage, in particular electronic storage. This paper considers these issues and the Inland Revenue Department (Inland Revenue) Standard Practice Statement which deals with inter alia retention of business records in electronic format and offshore record storage. Employer provided accommodation is treated as income to the benefitting employee. A recent amendment to the Income Tax Act 2007 retrospectively provides that certain employer provided accommodation is exempt from tax. The time aspect of these rules is extended where the employee is involved in the Canterbury rebuild and comes from outside the region.

Audio, Radio New Zealand

TODD McCLAY to the Minister of Finance: What reports has he received on the Government's financial position? DAVID SHEARER to the Prime Minister: Does he stand by all his statements? METIRIA TUREI to the Prime Minister: Does he stand by his reported statement that "anyone expecting details of a 'cosy sort of little deal' would be disappointed" by the Deputy Auditor-General's report into the SkyCity Convention Centre negotiations. DENIS O'ROURKE to the Minister for Canterbury Earthquake Recovery: What criteria did he use in deciding that owners of vacant sections in the red zone of Christchurch should only be compensated at half of the sections' most recent rateable value? KANWALJIT SINGH BAKSHI to the Minister for Economic Development: What economic opportunities will a new convention centre bring for Auckland? Hon DAVID PARKER to the Prime Minister: Did he or his office receive the 12 November 2009 report from Ministry officials to the Department of Prime Minister and Cabinet, summarising the process with SkyCity for the building of a convention centre; if so, did he read it? MIKE SABIN to the Associate Minister for Social Development: What steps is the Government taking to reduce welfare fraud? Hon CLAYTON COSGROVE to the Minister for State Owned Enterprises: What contingency plans, if any, does the Government have in place regarding its asset sale programme should the Tiwai Point aluminium smelter reduce production? KEVIN HAGUE to the Minister of Trade: Will New Zealand support Australia's objection to signing up to investor-state dispute provisions in the Trans-Pacific Partnership agreement; if not, why not? Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: Why is he offering only 50 percent of rating valuation for commercial or bare land in the residential red zone where the land could not be insured? MARK MITCHELL to the Minister of Corrections: What announcements has she made on improving prisoner employment training in New Zealand prisons? CHRIS HIPKINS to the Minister of Education: Does she stand by all her decisions in relation to schools in Christchurch?

Research papers, The University of Auckland Library

Following the devastation of the Canterbury earthquake sequence a unique opportunity exists to rebuild and restructure the city of Christchurch, ensuring that its infrastructure is constructed better than before and is innovative. By installing an integrated grid of modern sensor technologies into concrete structures during the rebuild of the Christchurch CBD, the aim is to develop a network of self-monitored ‘digital buildings’. A diverse range of data will be recorded, potentially including parameters such as concrete stresses, strains, thermal deformations, acoustics and the monitoring of corrosion of reinforcement bars. This procedure will allow an on-going complete assessment of the structure’s performance and service life, both before and after seismic activity. The data generated from the embedded and surface mounted sensors will be analysed to allow an innovative and real-time health monitoring solution where structural integrity is continuously known. This indication of building performance will allow the structure to alert owners, engineers and asset managers of developing problems prior to failure thresholds being reached. A range of potential sensor technologies for monitoring the performance of existing and newly constructed concrete buildings is discussed. A description of monitoring work conducted on existing buildings during the July 2013 Cook Strait earthquake sequence is included, along with details of current work that investigates the performance of sensing technologies for detecting crack formation in concrete specimens. The potential market for managing the real-time health of installed infrastructure is huge. Civil structures all over the world require regular visual inspections in order to determine their structural integrity. The information recorded during the Christchurch rebuild will generate crucial data sets that will be beneficial in understanding the behaviour of concrete over the complete life cycle of the structure, from construction through to operation and building repairs until the time of failure. VoR - Version of Record

Audio, Radio New Zealand

Questions to Ministers 1. TODD McCLAY to the Minister of Finance: What reports has he received on the Government's financial position? 2. DAVID SHEARER to the Prime Minister: Does he stand by all his statements? 3. METIRIA TUREI to the Prime Minister: Does he stand by his reported statement that "anyone expecting details of a 'cosy sort of little deal' would be disappointed" by the Deputy Auditor-General's report into the SkyCity Convention Centre negotiations. 4. DENIS O'ROURKE to the Minister for Canterbury Earthquake Recovery: What criteria did he use in deciding that owners of vacant sections in the red zone of Christchurch should only be compensated at half of the sections' most recent rateable value? 5. KANWALJIT SINGH BAKSHI to the Minister for Economic Development: What economic opportunities will a new convention centre bring for Auckland? 6. Hon DAVID PARKER to the Prime Minister: Did he or his office receive the 12 November 2009 report from Ministry officials to the Department of Prime Minister and Cabinet, summarising the process with SkyCity for the building of a convention centre; if so, did he read it? 7. MIKE SABIN to the Associate Minister for Social Development: What steps is the Government taking to reduce welfare fraud? 8. Hon CLAYTON COSGROVE to the Minister for State Owned Enterprises: What contingency plans, if any, does the Government have in place regarding its asset sale programme should the Tiwai Point aluminium smelter reduce production? 9. KEVIN HAGUE to the Minister of Trade: Will New Zealand support Australia's objection to signing up to investor-state dispute provisions in the Trans-Pacific Partnership agreement; if not, why not? 10. Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: Why is he offering only 50 percent of rating valuation for commercial or bare land in the residential red zone where the land could not be insured? 11. MARK MITCHELL to the Minister of Corrections: What announcements has she made on improving prisoner employment training in New Zealand prisons? 12. CHRIS HIPKINS to the Minister of Education: Does she stand by all her decisions in relation to schools in Christchurch?

Audio, Radio New Zealand

Questions to Ministers 1. TODD McCLAY to the Minister of Finance: What reports has he received on the Government's financial position? 2. DAVID SHEARER to the Prime Minister: Does he stand by all his statements? 3. METIRIA TUREI to the Prime Minister: Does he stand by his reported statement that "anyone expecting details of a 'cosy sort of little deal' would be disappointed" by the Deputy Auditor-General's report into the SkyCity Convention Centre negotiations. 4. DENIS O'ROURKE to the Minister for Canterbury Earthquake Recovery: What criteria did he use in deciding that owners of vacant sections in the red zone of Christchurch should only be compensated at half of the sections' most recent rateable value? 5. KANWALJIT SINGH BAKSHI to the Minister for Economic Development: What economic opportunities will a new convention centre bring for Auckland? 6. Hon DAVID PARKER to the Prime Minister: Did he or his office receive the 12 November 2009 report from Ministry officials to the Department of Prime Minister and Cabinet, summarising the process with SkyCity for the building of a convention centre; if so, did he read it? 7. MIKE SABIN to the Associate Minister for Social Development: What steps is the Government taking to reduce welfare fraud? 8. Hon CLAYTON COSGROVE to the Minister for State Owned Enterprises: What contingency plans, if any, does the Government have in place regarding its asset sale programme should the Tiwai Point aluminium smelter reduce production? 9. KEVIN HAGUE to the Minister of Trade: Will New Zealand support Australia's objection to signing up to investor-state dispute provisions in the Trans-Pacific Partnership agreement; if not, why not? 10. Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: Why is he offering only 50 percent of rating valuation for commercial or bare land in the residential red zone where the land could not be insured? 11. MARK MITCHELL to the Minister of Corrections: What announcements has she made on improving prisoner employment training in New Zealand prisons? 12. CHRIS HIPKINS to the Minister of Education: Does she stand by all her decisions in relation to schools in Christchurch?

Research papers, The University of Auckland Library

The recent instances of seismic activity in Canterbury (2010/11) and Kaikōura (2016) in New Zealand have exposed an unexpected level of damage to non-structural components, such as buried pipelines and building envelope systems. The cost of broken buried infrastructure, such as pipeline systems, to the Christchurch Council was excessive, as was the cost of repairing building envelopes to building owners in both Christchurch and Wellington (due to the Kaikōura earthquake), which indicates there are problems with compliance pathways for both of these systems. Councils rely on product testing and robust engineering design practices to provide compliance certification on the suitability of product systems, while asset and building owners rely on the compliance as proof of an acceptable design. In addition, forensic engineers and lifeline analysts rely on the same product testing and design techniques to analyse earthquake-related failures or predict future outcomes pre-earthquake, respectively. The aim of this research was to record the actual field-observed damage from the Canterbury and Kaikōura earthquakes of seismic damage to buried pipeline and building envelope systems, develop suitable testing protocols to be able to test the systems’ seismic resilience, and produce prediction design tools that deliver results that reflect the collected field observations with better accuracy than the present tools used by forensic engineers and lifeline analysts. The main research chapters of this thesis comprise of four publications that describe the gathering of seismic damage to pipes (Publication 1 of 4) and building envelopes (Publication 2 of 4). Experimental testing and the development of prediction design tools for both systems are described in Publications 3 and 4. The field observation (discussed in Publication 1 of 4) revealed that segmented pipe joints, such as those used in thick-walled PVC pipes, were particularly unsatisfactory with respect to the joint’s seismic resilience capabilities. Once the joint was damaged, silt and other deleterious material were able to penetrate the pipeline, causing blockages and the shutdown of key infrastructure services. At present, the governing Standards for PVC pipes are AS/NZS 1477 (pressure systems) and AS/NZS 1260 (gravity systems), which do not include a protocol for evaluating the PVC pipes for joint seismic resilience. Testing methodologies were designed to test a PVC pipe joint under various different simultaneously applied axial and transverse loads (discussed in Publication 3 of 4). The goal of the laboratory experiment was to establish an easy to apply testing protocol that could fill the void in the mentioned standards and produce boundary data that could be used to develop a design tool that could predict the observed failures given site-specific conditions surrounding the pipe. A tremendous amount of building envelope glazing system damage was recorded in the CBDs of both Christchurch and Wellington, which included gasket dislodgement, cracked glazing, and dislodged glazing. The observational research (Publication 2 of 4) concluded that the glazing systems were a good indication of building envelope damage as the glazing had consistent breaking characteristics, like a ballistic fuse used in forensic blast analysis. The compliance testing protocol recognised in the New Zealand Building Code, Verification Method E2/VM1, relies on the testing method from the Standard AS/NZS 4284 and stipulates the inclusion of typical penetrations, such as glazing systems, to be included in the test specimen. Some of the building envelope systems that failed in the recent New Zealand earthquakes were assessed with glazing systems using either the AS/NZS 4284 or E2/VM1 methods and still failed unexpectedly, which suggests that improvements to the testing protocols are required. An experiment was designed to mimic the observed earthquake damage using bi-directional loading (discussed in Publication 4 of 4) and to identify improvements to the current testing protocol. In a similar way to pipes, the observational and test data was then used to develop a design prediction tool. For both pipes (Publication 3 of 4) and glazing systems (Publication 4 of 4), experimentation suggests that modifying the existing testing Standards would yield more realistic earthquake damage results. The research indicates that including a specific joint testing regime for pipes and positioning the glazing system in a specific location in the specimen would improve the relevant Standards with respect to seismic resilience of these systems. Improving seismic resilience in pipe joints and glazing systems would improve existing Council compliance pathways, which would potentially reduce the liability of damage claims against the government after an earthquake event. The developed design prediction tool, for both pipe and glazing systems, uses local data specific to the system being scrutinised, such as local geology, dimensional characteristics of the system, actual or predicted peak ground accelerations (both vertically and horizontally) and results of product-specific bi-directional testing. The design prediction tools would improve the accuracy of existing techniques used by forensic engineers examining the cause of failure after an earthquake and for lifeline analysts examining predictive earthquake damage scenarios.