Asset Investigation Management Plan
Articles, UC QuakeStudies
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A flowchart which illustrates where the G-File was used throughout the life cycle of asset data collection, processing and delivery.
A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.
A video of a presentation by Richard Conlin during the Community Resilience Stream of the 2016 People in Disasters Conference. The presentation is titled, "Resilience, Poverty, and Seismic Culture".The abstract for this presentation reads as follows: A strategy of resilience is built around the recognition that effective emergency response requires community involvement and mobilization. It further recognizes that many of the characteristics that equip communities to respond most effectively to short term emergencies are also characteristics that build strong communities over the long term. Building resilient communities means integrating our approaches to poverty, community engagement, economic development, and housing into a coherent strategy that empowers community members to engage with each other and with other communities. In this way, resilience becomes a complementary concept to sustainability. This requires an asset-based change strategy where external agencies meet communities where they are, in their own space, and use collective impact approaches to work in partnership. This also requires understanding and assessing poverty, including physical, financial, and social capital in their myriad manifestations. Poverty is not exclusively a matter of class. It is a complex subject, and different communities manifest multiple versions of poverty, which must be respected and understood through the asset-based lens. Resilience is a quality of a community and a system, and develops over time as a result of careful analysis of strengths and vulnerabilities and taking actions to increase competencies and reduce risk situations. Resilience requires maintenance and must be developed in a way that includes practicing continuous improvement and adaptation. The characteristics of a resilient community include both physical qualities and 'soft infrastructure', such as community knowledge, resourcefulness, and overall health. This presentation reviews the experience of some earlier disasters, outlines a working model of how emergency response, resilience, and poverty interact and can be addressed in concert, and concludes with a summary of what the 2010 Chilean earthquake tells us about how a 'seismic culture' can function effectively in communities even when government suffers from unexpected shortcomings.
The operation of telecommunication networks is critical during business as usual times, and becomes most vital in post-disaster scenarios, when the services are most needed for restoring other critical lifelines, due to inherent interdependencies, and for supporting emergency and relief management tasks. In spite of the recognized critical importance, the assessment of the seismic performance for the telecommunication infrastructure appears to be underrepresented in the literature. The FP6 QuakeCoRE project “Performance of the Telecommunication Network during the Canterbury Earthquake Sequence” will provide a critical contribution to bridge this gap. Thanks to an unprecedented collaboration between national and international researchers and highly experienced asset managers from Chorus, data and evidences on the physical and functional performance of the telecommunication network after the Canterbury Earthquakes 2010-2011 have been collected and collated. The data will be processed and interpreted aiming to reveal fragilities and resilience of the telecommunication networks to seismic events