Object overview of "Earthquake risk assessment study Part 1 - Review of risk assessment methodologies and development of a draft risk assessment methodology for Christchurch".
The flyer for the seminar "Seismic Assessment of Existing Masonry Buildings" presented by Professor Sergio Lagomarsino from the University of Genoa. The seminar demonstrated recent European research into modelling strategies, target performances and acceptance criteria for seismic assessment of masonry buildings.
This study evaluated and recommended a methodology for undertaking an earthquake risk assessment for Christchurch, incorporating hazard analysis, inventory collection, damage modelling and loss estimation. See Object Overview for background and usage information.
A video of the seminar "Seismic Assessment of Existing Masonry Buildings" presented by Professor Sergio Lagomarsino from the University of Genoa on 27 February 2014 at the University of Canterbury. The seminar demonstrated recent European research into modelling strategies, target performances and acceptance criteria for seismic assessment of masonry buildings.
Object Overview of 'Earthquake hazard and risk assessment study Stage 1 Part B: Probabilistics seismic hazard assessment and earthquake scenarios for the Canterbury region, and historic earthquakes in Christchurch (Stirling et al, 1999).'
As the result of the September 4th 2010 Canterbury earthquake and associated aftershocks on February 22nd 2011 and June 13th 2011, final examinations in the two 100 level economics papers at Canterbury University were cancelled at short notice in semester one 2011. The final examination weightings were spread over the remaining assessments to obtain a final grade for students. This paper attempts to establish how different online assessment conditions affect final grade distributions when online assessments are substituted for an invigilated final examination. Pearson correlation coefficients and Spearman rank order correlation coefficients are used to show that there is a greater correlation between online quizzes and invigilated assessments when those quizzes are only available for a restricted period of time, compared to the whole semester. We find that online quizzes are more closely correlated with invigilated assessments when the first attempt at a quiz is recorded, as opposed to the highest of two attempts. We also find that using the first attempt leads to less grade disruption when compared to a “normal” semester that includes a final examination. Finally, the actual impact on student grades when online quizzes are substituted for a final examination is discussed.
Nick Rogers, project director, Canterbury Land Assessment for Tonkin & Taylor. Tonkin & Taylor is the environmental and engineering consultancy doing the Canterbury land damage assessment work for EQC and the Canterbury Earthquake Recovery Authority.
Object Overview for 'Updated probabilistic seismic hazard assessment for the Canterbury region (Stirling et al, 2007) and Updated probabilistic seismic hazard assessment for the Canterbury region: addendum report (Stirling et al, 2008)'.
Collection Overview of 'District earthquake hazard assessments for engineering lifelines.'
Some Canterbury homeowners say their houses have dropped in value because the damage to their properties was inadequately assessed by the Earthquake Commission after the 2010 and 2011 earthquakes. Independent land surveyor, Adrian Cowie, and a Burwood homeowner affected by the quakes, Selwyn Stafford, talk about the issues facing them.
Object Overview for 'Earthquake Hazard Assessment for Kaikoura District (Yetton & McCahon, 2009)'
Object Overview for 'Selwyn District engineering lifelines project: Earthuake hazard assessment'
Object Overview of 'Ashburton District engineering lifelines project: Earthquake hazard assessment'
Environment Canterbury's overview of their Regional Earthquake Hazard and Risk Assessment Studies.
Object Overview of 'Earthquake Hazard Assessment for Waimakariri District (Yetton & McCahon, 2009).'
An American quake expert has criticised the risk assessment done following the Canterbury earthquake, and suggested authorities are being too cautious.
Object Overview of 'Hunter Hills Fault Zone study – Earthquake hazard assessment (Yetton, 2008).'
The need for a simple but rigorous seismic assessment procedure to predict damage to reinforced concrete buildings during a seismic event has been highlighted following the Canterbury Earthquake sequence. Such simplified assessment procedure, applied to individual structure or large building inventory, should not only have low requirement in terms of input information and involve straightforward analyses, but also should be capable to provide reliable predictive results within short timeframe. This research provides a general overview and critical comparison of alternative simplified assessment procedures adopted in NZSEE 2006 Guidelines (Assessment and Improvement of the Structural Performance of Buildings in Earthquakes), ASCE 41-13 (Seismic Evaluation and Retrofit of Existing Buildings), and EN: 1998-3: 2005 (Assessment and Retrofitting of Buildings). Particular focus is given to the evaluation of the capability of Simplified Lateral Mechanism Analysis (SLaMa), which is an analytical pushover method adopted in NZSEE 2006 Guidelines. The predictive results from SLaMa are compared to damages observed for a set of reinforced concrete buildings in Christchurch, as well as the results from more detailed assessment procedure based on numerical modelling. This research also suggests improvements to SLaMa, together with validation of the improvements, to include assessment of local mechanism by strength hierarchy evaluation, as well as to develop assessment of global mechanism including post-yield mechanism sequence based on local mechanism.
Object Overview of 'Timaru District Engineering Lifelines Project: Earthquake Hazard Assessment (Yetton & McCahon, 2001).'
Object Overview of 'Hurunui District Engineering Lifelines Project: Natural Hazard Assessment (Yetton et al, 2000).'
Environmental assessment in New Zealand is governed by the provisions of the Resource Management Act (RMA) 1991. The Act requires persons wishing to undertake certain activities to apply for resource consent from their local or regional council - a procedure termed the Resource Consent Process. The key component of a resource consent application is an Assessment of Environmental Effects (AEE) report; a statement of the environmental effects of a proposed activity. Problems arise when environmental assessments are complicated by uncertain and abnormal circumstances such as natural hazards. Natural hazards (including earthquakes, floods, tsunami, and coastal erosion) can be catastrophic to an environment. If hazards are not avoided or successfully mitigated, they can result in serious consequences to proposed development and to the environment which the proposal relates. The aim of this study is to assess the adequacy of the resource consent process (as outlined in the Resource Management Act 1991) for dealing with proposed development affected by natural hazards. This study reviews the context of the resource consent process for dealing with natural hazards to identify potential issues in the assessment process. Guidance criteria for assessing natural hazards (termed Natural Hazard Assessment) are developed to evaluate against two resource consent applications affected by natural hazards. The findings of the consent process review and case study evaluation are discussed to determine the adequacy of the consent process for dealing with natural hazards. From the review of the consent process it was evident that the process has a number of problems for accommodating natural hazards into the assessment. Although many important traits are provided for in the process, such traits are not always reflected in environmental assessments. Evaluation of two resource consent applications against the process of Natural Hazard Assessment (NHA) showed that these consent applications did not adequately detail key information relating to natural hazards. Many problems evident in these applications were not amended by the Consent Authorities in the review process and subsequently consent was granted to information-deficient applications. Problematic issues identified in this study include: • A distinct lack of guidance (legal or otherwise) for the applicant and Consent Authority regarding the boundaries of inclusion of an effect; • Deficiencies in planning documents are reflected in AEE reports, the review of the consent application and in the end-decision; • Under-utilisation of "experts" throughout the consent process; • Minimal identification and account for the degree of uncertainty throughout the consent process; • Resource consents are being granted even though information in consent applications, and the means for assessing the information is deficient. These issues reflect that decisions are not being made based on all elements involved in a potential hazard. Subsequently, the resource consent process is not adequate for dealing with all aspects of natural hazards. The Natural Hazard Assessment process provides educated assessment criteria to assess development affected by natural hazards. By accounting for the problems evident in the consent process, the introduction of a three-tier identification, risk and vulnerability assessment, and evaluation process to account for uncertainties, Natural Hazard Assessment provides a platform for a thorough assessment of natural hazards. The application of the principles of Natural Hazard Assessment to the consent applications affected by natural hazards showed that many key issues were not covered in the assessment under the consent process. The nature of a natural event is that one may not occur in a given region over many lifetimes, however they will occur at some stage and planning and environmental assessment needs to provide for the associated hazards. Implementation of Natural Hazard Assessment is needed to help provide answers for the problems experienced in the resource consent process. Natural Hazard Assessment would allow decision-makers to make informed judgements on the situation at hand, leading to better planning and land-use options. Change to current practice is needed, as following the current path of environmental assessment will be the hazard in the end.
Object overview for 'Updated probabilistic seismic hazard assessment for the Canterbury region: addendum report'.
The Canterbury Earthquakes Royal Commission has heard the property manager of the Pyne Gould building did not organise detailed engineering assessments after the first quake in September.
Object Overview of 'Earthquake Hazard Assessment for Waimate, Mackenzie and part Waitaki districts (Yetton & McCahon, 2008).'
Rapid assessment teams are being sent out across quake hit Canterbury with the Earthquake Commission promising that up to 180-thousand homes will be inspected within the next eight weeks.
This study updated the 1999 Earthquake hazard and risk assessment study Stage 1 Part B: Probabilistic seismic hazard assessment and Earthquake scenarios for the Canterbury region, and historic earthquakes in Christchurch report. It incorporated new fault data, a new distributed seismicity model and new methods for estimating Modified Mercalli intensities. See Object Overview for background and usage information.
"Training and Education of Engineers and Organisation of Engineering Profession and Building Assessment after Earthquakes", a report submitted by the then New Zealand Historic Places Trust on the Royal Commission Discussion Papers.
This study updated the 1999 Earthquake hazard and risk assessment study Stage 1 Part B: Probabilistic seismic hazard assessment and Earthquake scenarios for the Canterbury region, and historic earthquakes in Christchurch report. It incorporated new fault data, a new distributed seismicity model and new methods for estimating Modified Mercalli intensities. See Object Overview for background and usage information.
A lack of building inspections and the engineers to carry them out has come under further scrutiny at the Royal Commission of inquiry into the Canterbury earthquakes.
Object Overview of 'Earthquake hazard and risk assessment study Stage 1 Part A: Earthquake source identification and characterisation'.