Search

found 27 results

Audio, Radio New Zealand

It's been a long road to recovery for one of Christchurch's biggest post-quake projects. Eight years after the route connecting Sumner to Lyttleton was blocked off by the earthquakes, the road through Evans Pass will reopen on Friday. Sumner residents will now have a second route into the suburb, as well as a renewed connection to Lyttleton. Sara Templeton is the councillor for Heathcote Ward, which covers Sumner, and speaks to Guyon Espiner.

Videos, UC QuakeStudies

A video of an interview with Laurence Mote about the wall of containers in Sumner. Shipping containers line the south side of Main Road in Sumner, protecting road users from potential rock fall from the cliffs above. Mote bikes past the containers every day on his way to work. He talks about the risks facing cyclists along Main Road and in greater Christchurch, including pot holes and narrow roads. He advises cyclists to wear bright clothing and lights, and for cars to slow down and give cyclists room.

Articles, Christchurch uncovered

During recent earthquake repairs at a residential property on well-known Sumner Road in Lyttelton, our archaeologists uncovered a small assemblage of artefacts that represented everyday Victorian household items. At first glance these appeared a somewhat ordinary – but when Lydia … Continue readi...

Videos, UC QuakeStudies

Aerial footage of Christchurch recorded the day after the 22 February 2011 earthquake. The footage shows damage to the Smith City car park, the Cathedral of the Blessed Sacrament, the CTV Building, the PGC Building, the Durham Street Methodist Church, the Lyttelton Timeball Station, the roads alongside the Avon River, and the ChristChurch Cathedral. It also shows New Zealand Army road blocks outside the hospital, crushed buses on Colombo Street, a Royal New Zealand Navy vessel in Lyttelton Harbour, rock fall on the Summit Road, collapsed cliffs in Sumner and Redcliffs, tents set up in a park, flooding in New Brighton, and liquefaction in QEII Park.

Images, eqnz.chch.2010

20130125_1749_1D3-400 Road Closed 1 The Lyttelton side of Evans Pass is closed (since the earthquake 23 months ago - 22/02/11). Prior to the road tunnel (through the Port Hills) opening in the early 1960s this was the main access road to the port of Lyttelton. #3072