On a walk around the city to catch up on what is happening May 29, 2014 Christchurch New Zealand.
Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store.
It featured the South Island's first escalator, w...
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A technical paper prepared for the Water NZ conference and expo 2012, which details how GIS and InfoNet were used to complement SCIRT's asset assessment process.
A document which outlines SCIRT's post-earthquake asset assessment process.
A diagram which illustrates SCIRT's asset assessment request process.
A report reviewing pipe installation specifications and recommending alternatives that could improve standard specifications.
A pdf copy of a PowerPoint presentation prepared for the Christchurch City Council and CPG New Zealand, providing an overview of the investigation work completed.
A design guideline which provides information about how to use the SCIRT Asset Assessment Spreadsheet.
Aftermath of September 4th Earthquake in Canterbury NZ. Storm drains - Lower Styx Road, Brooklands.
Aftermath of September 4th Earthquake in Canterbury (area covers Christchurch City) NZ. Storm drains - Anfield Street, Brooklands.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A report which details the archaeological investigations carried out during the course of SCIRT projects 11115 and 11159, wastewater renewal work and storm water repair work on Ferry Road.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.