A photograph of a mural on Cashel Street, on the former site of St Paul's Trinity Pacific Presbyterian Church.
The partially collapsed St. Paul's-Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets. Scaffolding erected around the building after the 4 September 2010 earthquake has collapsed on to the Madras Street footpath.
A view across Madras Street to St Pauls Trinity-Pacific Presbyterian Church. Scaffolding has been constructed around the building to enable repairs to be made. The church was damaged in the 4 September 2010 earthquake.
Scaffolding erected around St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets to enable repairs to be made to the building. The church was damaged in the 4 September 2010 earthquake.
Scaffolding erected around St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets to enable repairs to be made to the building. The church was damaged in the 4 September 2010 earthquake.
Scaffolding erected around St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets to enable repairs to be made to the building. The church was damaged in the 4 September 2010 earthquake.
Scaffolding erected around St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets to enable repairs to be made to the building. The church was damaged in the 4 September 2010 earthquake.
The front of St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets. Scaffolding has been erected around the building to allow repairs to be made. A sealed crack is visible on the wall of the porch.
St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets. Scaffolding has been placed around the left dome of the building which was damaged during the 4 September earthquake. Plastic has also been placed over the dome to protect the inside from weather damage.
St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets. Scaffolding has been placed around the left dome of the building which was damaged during the 4 September earthquake. Plastic has also been placed over the dome to protect the inside from weather damage.
Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Site manager Mike McKee inspects the domes to be restored".
Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".
Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".
Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".
Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Site manager Mike McKee (left) and leading hand, Iain Piper, look over the work to be done in the towers".