A truck delivering scaffolding to the Engineering block.
Photograph captioned by Fairfax, "Marcus Goddin and Daniel Johnston of R&S Scaffolding erect the scaffolding so roof damage from the earthquake can be fixed on St Mary's church".
Scaffolding poles ready to be assembled in the E8 and E9 lecture theatre.
A worker cutting the scaffolding poles for the E8 and E9 lecture theatres.
A worker cutting the scaffolding poles for the E8 and E9 lecture theatres.
Workers survey the poles of scaffolding ready to be assembled in the E8 and E9 lecture theatres.
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers are kept busy moving scaffolding and fixtures".
Detail of a building on the corner of Manchester Street and Struthers Lane. A room covered in grafitti has been exposed after the wall crumbled. Scaffolding can be seen in front.
Damage to buildings on Manchester Street. Scaffolding has been erected outside a building where the wall has crumbled. Fencing has been placed on the footpath to keep the public away from the damaged buildings.
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers are kept busy moving scaffolding and fixtures and checking for damage".