Search

found 48 results

Images, eqnz.chch.2010

20130125_1749_1D3-400 Road Closed 1 The Lyttelton side of Evans Pass is closed (since the earthquake 23 months ago - 22/02/11). Prior to the road tunnel (through the Port Hills) opening in the early 1960s this was the main access road to the port of Lyttelton. #3072

Videos, UC QuakeStudies

A video of an interview with Gordon Smith, owner of Gordon Smith and Sons Fruiterers, about the road works outside his shop. Smith talks about how the road works have affected his business, decreasing the number of parks outside his shop and encouraging commuters to take alternative routes.

Images, eqnz.chch.2010

This is the Summit Road below Mt Cavendish and shows a few remaining high buildings in the central city beyond (in setting sun). Just above centre is the doomed AMI Stadium (1) aka Lancaster Park, home to Canterbury cricket and rugby till the erathquakes.

Images, eqnz.chch.2010

20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...

Images, UC QuakeStudies

A security fence stands behind fallen rubble and the charred remains of the McKenzie & Willis building on High Street. A portable toilet has been placed on the road next to a steel beam which is supporting the building.

Images, eqnz.chch.2010

While the whole of the North Island is under drought conditions and parts of the South Island likely to follow suit, I doubt it will happen in Christchurch. With hundreds of earthquake road, water and sewer repairs underway many are spilling hundreds of litres of water per minute, like this one outside my house. It has been running like this fo...

Audio, Radio New Zealand

The debt stricken state-owned enterprise Solid energy is in crisis talks with the Treasury and its banks, two years after the Christchurch earthquakes, insurance companies are blamed for delays in the rebuild, and in dateline pacific Papua New Guinea is building up its military to build roads.