Looks even better when Viewed On Black A view 4 weeks after the 7.1 magnitude earthquake in Christchurch. St Johns Church corner of Hereford Street and Latimer Square. Given a bit of a HDR process to add some of what I was "feeling" at the time.
A view 4 weeks after the 7.1 magnitude earthquake in Christchurch. St Johns Church corner of Hereford Street and Latimer Square. Given a bit of a HDR process to add some of what I was "feeling" at the time.
None
Objectives • To develop a system dynamics model of Christchurch post-quake reconstruction process that captures all the critical dynamics influencing its pathway • To investigate the implications of current rebuild pathway • To build a reconstruction module to be integrated in MERIT (Measuring the Economics of Resilient Infrastructure Tool)
A black and white historic photograph of the Clarendon Hotel, prior to its 1903 reconstruction, [1902].
A graphic showing the timeline for reconstruction.
An abstract which describes the content of Kristen MacAskill's full PhD thesis.
A photograph captioned by Paul Corliss, "Road reconstruction signs".
A photograph captioned by Paul Corliss, "Road reconstruction signs".
A photograph captioned by Paul Corliss, "Road reconstruction signs".
A photograph captioned by Paul Corliss, "Road reconstruction signs".
A photograph captioned by Paul Corliss, "Road reconstruction signs".
A photograph captioned by Paul Corliss, "Road reconstruction signs".
This paper shows an understanding of the availability of resources in post-disaster reconstruction and recovery in Christchurch, New Zealand following its September 4, 2010 and February 22, 2011 earthquakes. Overseas experience in recovery demonstrates how delays and additional costs may incur if the availability of resources is not aligned with the reconstruction needs. In the case of reconstruction following Christchurch earthquakes, access to normal resource levels will be insufficient. An on-line questionnaire survey, combined with in-depth interviews was used to collect data from the construction professionals that had been participated in the post-earthquake reconstruction. The study identified the resources that are subject to short supply and resourcing challenges that are currently faced by the construction industry. There was a varied degree of impacts felt by the surveyed organisations from resource shortages. Resource pressures were primarily concentrated on human resources associated with structural, architectural and land issues. The challenges that may continue playing out in the longer-term reconstruction of Christchurch include limited capacity of the construction industry, competition for skills among residential, infrastructure and commercial sectors, and uncertainties with respect to decision making. Findings provide implications informing the ongoing recovery and rebuild in New Zealand. http://www.iiirr.ucalgary.ca/Conference-2012
Chief Executive of the Christchurch Earthquake Reconstruction Authority, Roger Sutton.
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A black and white historic photograph of the reconstruction of Armstrong & Co., a major department store on the corner of Colombo and Armagh Streets, [ca. 1930].