A video of a presentation by Ian Campbell, Executive General Manager of the Stronger Christchurch Rebuild Team (SCIRT), during the third plenary of the 2016 People in Disasters Conference. The presentation is titled, "Putting People at the Heart of the Rebuild".The abstract for this presentation reads: On the face of it, the Stronger Christchurch Infrastructure Rebuild Team (SCIRT) is an organisation created to engineer and carry out approximately $2B of repairs to physical infrastructure over a 5-year period. Our workforce consists primarily of engineers and constructors who came from far and wide after the earthquakes to 'help fix Christchurch'. But it was not the technical challenges that drew them all here. It was the desire and ambition expressed in the SCIRT 'what we are here for' statement: 'to create resilient infrastructure that gives people security and confidence in the future of Christchurch'. For the team at SCIRT, people are at the heart of our rebuild programme. This is recognised in the intentional approach SCIRT takes to all aspects of its work. The presentation will touch upon how SCIRT communicated with communities affected by our work and how we planned and coordinated the programme to minimise the impacts, while maximising the value for both the affected communities and the taxpayers of New Zealand and rate payers of Christchurch funding it. The presentation will outline SCIRT's very intentional approach to supporting, developing, connecting, and enabling our people to perform, individually, and collectively, in the service of providing the best outcome for the people of Christchurch and New Zealand.
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A report which details the archaeological investigations carried out during the course of SCIRT project 11185, water main renewal work on Manchester Street.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A report which details the archaeological investigations carried out during the course of SCIRT projects 11115 and 11159, wastewater renewal work and storm water repair work on Ferry Road.
A media release which outlines the outcomes of the campaign to reclaim Christchurch cones.
A presentation which was given as part of the FME Desktop World Tour in 2015 in Christchurch.
An abstract which describes the content of Kristen MacAskill's full PhD thesis.
Photo manual and guide provided to design and delivery teams at SCIRT.
A document which describes the SCIRT model and how it drove both collaboration and competition.
A document which stipulates SCIRT's minimum standard for managing the risks arising from working around services.
A plan which describes how SCIRT is to carry out construction works. The first version of this plan was produced on 10 August 2011.
A management plan which describes how SCIRT will coordinate utility authorities and utility relocations.
A plan which defines the procurement activities to be applied to SCIRT and explains how those activities are to be undertaken to meet SCIRT objectives and requirements. The first version of this plan was produced on 14 September 2011.
A presentation created by LINZ, explaining the application and benefits of the National Forward Works Viewer.
A document which describes the purpose of the Bill Perry Safety Awards and outlines each winning submission.
A document which explains the rationale behind and development of City Care's Good to Go safety video.
A board paper which asks the SCIRT board to review and revise SCIRT's existing Health and Safety Policy.
A document which summarises each winning Bill Perry Safety Award submission.
A document which specifies the technical requirements for the rehabilitation and repair of pipes using lining methodologies during the SCIRT programme of work.
The SCIRT Health and Safety Policy, revised in February 2016.
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
An example of a monthly presentation created to communicate with all SCIRT team members about SCIRT's safety performance.
A report created by the University of Canterbury Quake Centre and the University of Auckland, funded by the Building Research Levy. It shows how an innovation process was initiated and managed throughout the rebuilding of the horizontal infrastructure after the Canterbury earthquakes.
A presentation given to Human Resource Institute of New Zealand members, outlining SCIRT's intentional approach to culture development.
A paper which outlines what had been achieved by SCIRT's Training Team, and proposing an approach to ensure that the learnings from SCIRT be transferred to wider industry.
An award submission nominating Jane Taylor for the Hays NAWIC Excellence Awards 2016: Category: Professional Tradeswoman of the Year.
A presentation which outlines SCIRT's approach to raising the visibility of and enabling women working in construction across the SCIRT programme.
A document which describes the establishment of the SCIRT Women in Construction (SWIC) group and its achievements.