Search

found 624 results

Images, UC QuakeStudies

Rubble from TJ's Kazbah on the corner of Marine Parade and Bowhill Road. The Ozone Hotel is visible in the foreground. The photographer comments, "A bike ride to New Brighton and the beach 3 weeks after the Feb 22 quake. Roads were still very rough and under reconstruction. There was a building on the corner, but not now".

Images, UC QuakeStudies

The damaged Ozone Hotel on Marine Parade. Fallen bricks lie on the ground in front of the building, which is surrounded by security fencing. The photographer comments, "A bike ride to New Brighton and the beach 3 weeks after the Feb 22 quake. Roads were still very rough and under reconstruction. Some buildings are still standing. but don't look too healthy".

Images, UC QuakeStudies

A pile of liquefaction silt on Medway Street is cordoned off with road cones. The photographer comments, "Piles of sand and subsiding roads at the intersection of Medway St with Woodchester Ave and Flesher Ave, 10 days after the February quake".