Search

found 436 results

Videos, UC QuakeStudies

A video showing engineers removing the latticework from the top of the Press Building in Cathedral Square. The latticework is being removed after engineers discovered it was being held onto the building by only two bolts. The bolts are no bigger than a little finger.

Videos, UC QuakeStudies

A video of an interview with Andrew Holden, Editor of The Press, about the 4 September 2010 earthquake. Holden talks about the status of the Press Building in Cathedral Square, The Press's temporary offices in the Novotel hotel, and the importance of newspapers in a post-disaster zone.

Images, UC QuakeStudies

Damage to the Caxton Press building (left) and the adjoining building. In front is a pile of bricks, cordonned off with tape and road cones to keep the public away. Spray-painted codes show that the buildings have been checked by USAR.