Search

found 40 results

Images, eqnz.chch.2010

20130808_2296_1D3-40 New Brighton bridge Prior to the earthquakes the stone wall at right was near road level. Now it is about 1.5m (4-5ft) lower. #4075

Images, eqnz.chch.2010

20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...