Search

found 28 results

Images, UC QuakeStudies

A view across London Street in Lyttelton to the Empire Hotel and the Lyttelton Bakery. The buildings have been cordoned off by a safety fence. Sections of the side wall of the Empire Hotel have crumbled and its facade has been braced with steel beams.

Images, Canterbury Museum

One landscape colour digital photograph taken on 27 May 2013 of London Street in Lyttelton. Taken from Sumner Road looking west across the intersection of London and Oxford Streets. The photograph shows several empty sections and the remaining buildings. The Lyttelton streetscape has changed dramatically from its pre-earthquake appearance and w...

Images, UC QuakeStudies

A digitally manipulated image of a sign reading "A bit of dirt never hurt". The photographer comments, "This was a sign put up on a section of land in the Port of Lyttelton where an earthquake damaged building had been removed. The cliff at the back had collapsed down probably during the demolition process".

Images, Canterbury Museum

One landscape colour digital photograph taken on 19 November 2011 showing part of the north side of London Street. The properties visible from left to right are: part of Lyttel Piko Organic and Wholefoods, Satchmo Café Pizzabar, Milly May and Snoclothes New Zealand. The empty section was formerly occupied by No. 6 Cafe. The Lyttelton streetsc...

Images, Canterbury Museum

One landscape colour digital photograph taken on 27 May 2013 of a retaining wall in Sumner Road which was replaced due to earthquake damage. The original wall was created using red volcanic rock. Many walls like this were built using the Hard Labour Gang from the Lyttelton Gaol. The replacement wall has a small section of stone installed to sho...

Images, Canterbury Museum

One landscape colour digital photograph taken on 27 May 2013 of a retaining wall in Sumner Road which was replaced due to earthquake damage. The original wall was created using red volcanic rock. Many walls like this were built using the Hard Labour Gang from the Lyttelton Gaol. The replacement wall has a small section of stone installed to sho...

Research papers, University of Canterbury Library

This thesis is concerned with modelling rockfall parameters associated with cliff collapse debris and the resultant “ramp” that formed following the high peak ground acceleration (PGA) events of 22 February 2011 and 13 June 2011. The Christchurch suburb of Redcliffs, located at the base of the Port Hills on the northern side of Banks Peninsula, New Zealand, is comprised of Miocene-age volcanics with valley-floor infilling marine sediments. The area is dominated by basaltic lava flows of the Mt Pleasant Formation, which is a suite of rocks forming part of the Lyttelton Volcanic Group that were erupted 11.0-10.0Ma. Fresh exposure enabled the identification of a basaltic ignimbrite unit at the study site overlying an orange tuff unit that forms a marker horizon spanning the length of the field area. Prior to this thesis, basaltic ignimbrite on Banks Peninsula has not been recorded, so descriptions and interpretations of this unit are the first presented. Mapping of the cliff face by remote observation, and analysis of hand samples collected from the base of the debris slopes, has identified a very strong (>200MPa), columnar-jointed, welded unit, and a very weak (<5MPa), massive, so-called brecciated unit that together represent the end-member components of the basaltic ignimbrite. Geochemical analysis shows the welded unit is picrite basalt, and the brecciated unit is hawaiite, making both clearly distinguishable from the underlying trachyandesite tuff. RocFall™ 4.0 was used to model future rockfalls at Redcliffs. RocFall™ is a two-dimensional (2D), hybrid, probabilistic modelling programme for which topographical profile data is used to generate slope profiles. GNS Science collected the data used for slope profile input in March 2011. An initial sensitivity analysis proved the Terrestrial Laser Scan (TLS)-derived slope to be too detailed to show any results when the slope roughness parameter was tested. A simplified slope profile enabled slope roughness to be varied, however the resulting model did not correlate with field observations as well. By using slope profile data from March 2011, modelled rockfall behaviour has been calibrated with observed rockfall runout at Redcliffs in the 13 June 2011 event to create a more accurate rockfall model. The rockfall model was developed on a single slope profile (Section E), with the chosen model then applied to four other section lines (A-D) to test the accuracy of the model, and to assess future rockfall runout across a wider area. Results from Section Lines A, B, and E correlate very well with field observations, with <=5% runout exceeding the modelled slope, and maximum bounce height at the toe of the slope <=1m. This is considered to lie within observed limits given the expectation that talus slopes will act as a ramp on which modelled rocks travel further downslope. Section Lines C and D produced higher runout percentage values than the other three section lines (23% and 85% exceeding the base of the slope, respectively). Section D also has a much higher maximum bounce height at the toe of the slope (~8.0m above the slope compared to <=1.0m for the other four sections). Results from modelling of all sections shows the significance of the ratio between total cliff height (H) and horizontal slope distance (x), and of maximum drop height to the top of the talus (H*) and horizontal slope distance (x). H/x can be applied to the horizontal to vertical ratio (H:V) as used commonly to identify potential slope instability. Using the maximum value from modelling at Redcliffs, the future runout limit can be identified by applying a 1.4H:1V ratio to the remainder of the cliff face. Additionally, the H*/x parameter shows that when H*/x >=0.6, the percentage of rock runout passing the toe of the slope will exceed 5%. When H*/x >=0.75, the maximum bounce height at the toe of the slope can be far greater than when H*/x is below this threshold. Both of these parameters can be easily obtained, and can contribute valuable guideline data to inform future land-use planning decisions. This thesis project has demonstrated the applicability of a 2D probabilistic-based model (RocFall™ 4.0) to evaluate rockfall runout on the talus slope (or ramp) at the base of ~35-70m high cliff with a basaltic ignimbrite source. Limitations of the modelling programme have been identified, in particular difficulties with adjusting modelled roughness of the slope profile and the inability to consider fragmentation. The runout profile using RocFall™ has been successfully calibrated against actual profiles and some anomalous results have been identified.

Audio, Radio New Zealand

Questions to Ministers 1. Hon DAVID PARKER to the Minister of Finance: What was the combined increase in the value of the Crown's equity in Meridian, Mighty River Power, Solid Energy, Genesis and Air New Zealand for each of the last five years? 2. SIMON BRIDGES to the Minister of Finance: How did Budget 2011 continue the Government's programme to build faster growth, higher incomes and more jobs? 3. Hon MARYAN STREET to the Minister of Foreign Affairs: Have all recent actions of New Zealand's diplomats been consistent with Government policy? 4. Hon TAU HENARE to the Minister of Health: What reports has he received about improved access to dialysis for patients in Auckland and Waitemata? 5. Dr RUSSEL NORMAN to the Minister of Finance: Will the Government have to borrow further to pay for the latest Christchurch earthquakes? 6. GRANT ROBERTSON to the Minister of Health: Does he agree with the statement of the Auditor-General, "Despite the encouraging improvements made in the last 10 years, we do not yet have a system for scheduled services that can demonstrate national consistency and equitable treatment for all"? 7. AMY ADAMS to the Minister for the Environment: What steps has the Government taken to facilitate resource consents for work required at the Lyttelton Port to ensure it is able to recover quickly from earthquake damage? 8. JACINDA ARDERN to the Prime Minister: Does he stand by the statement made on his behalf that "this Government is focused on improvements within the economy in order to create the platform on which business and New Zealanders can invest and grow jobs"? 9. TE URUROA FLAVELL to the Minister of Health: Does he agree that under section 118 of the Health Practitioners Competence Assurance Act 2003, the Medical Council has a responsibility to ensure the cultural competence of doctors, and what support has the Government provided to the health sector to ensure cultural competence is achieved across the health sector? 10. DAVID SHEARER to the Minister of Science and Innovation: Does he agree with Professor Sir Paul Callaghan's statement on science and innovation "it's clear that the Minister of Finance and the Prime Minister have not really seen this as a top priority"? 11. CHESTER BORROWS to the Minister of Justice: What progress is being made on preparations for the referendum on the electoral system to be held in conjunction with this year's general election? 12. Hon RICK BARKER to the Minister of Veterans' Affairs: When can veterans expect to have a full response from the Government in response to the Law Commission's report "A New Support Scheme for Veterans"?