Search

found 34 results

Videos, UC QuakeStudies

A video of an interview with artefact analyst Gwen Jackson, about the artefacts found at the site of the Theatre Royal. Hundreds of artefacts were found under the Isaac Theatre Royal, including bottles and ceramic shards. This was part of a greater project by archaeologists to examine pre-1900 sites in the Christchurch central city before work is conducted on them. Archaeological assessment of pre-1900 buildings is required by the 1993 Historic Places Act before work can be done on the site.

Images, UC QuakeStudies

A photograph of people gathered at the corner of Gloucester Street and Colombo Street for Picture Palace Parade - a tour of Cathedral Square's historic cinema sites and outdoor movie screening of Heavenly Creatures. The event was part of FESTA 2014.

Videos, UC QuakeStudies

A video about the discovery of a historic tramline on North Avon Road. The video includes an interview with Brent Leersynder, a site engineer for SCIRT, and Steve Timpson, site foreman for SCIRT. The SCIRT team found the tramline while repairing the damaged wastewater system under North Avon Road in May.

Videos, UC QuakeStudies

A video of an interview with Zak and Alasdair Cassels about the development of the historic tannery site in Woolston. The Cassels are developing the site into a Victorian-style arcade which will house up to 70 tenants, including bars, restaurants, a music venue, gift shops, fashion stores, a hair salon, a Pilates studio, a tattoo parlour, and an art gallery. The video also includes an interview with Sarah Odering, the manger of Dead Set.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Site manager Mike McKee inspects the domes to be restored".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Site manager Mike McKee (left) and leading hand, Iain Piper, look over the work to be done in the towers".

Images, Alexander Turnbull Library

Text at top left reads 'Don't forget rubbish day' The cartoon is a large wheelie bin stacked high with debris from 'old dunger buildings'. Someone in a damaged house nearby says 'Good riddance!' Context - Two earthquakes and hundreds of aftershocks have hit Christchurch, the first on 4 September 2010 and a second more devastating one on 22 February 2011. Earthquake Recovery Minister Gerry Brownlee may or may not have actually used the words 'old dungers' to describe some of Christchurch's heritage buildings that are not worth keeping but he might as well have done because many people believe that this is the way he thinks. Debate about which heritage buildings should be kept and which demolished has begun along with debate about how the city should be rebuilt. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Shows a sick and damaged Christchurch Anglican Cathedral in a hospital bed with two attendants. The Cathedral asks 'Can ya just pull the plug and let me die peacefully?'. Context refers to recent comments by Bishop Victoria Matthews that the Christchurch Cathedral is 'being left to die with no dignity' because of ongoing legal battles about its future. There has been ongoing debate and controversy over whether the Cathedral should be demolished, reconstructed or restored following damage suffered in the February 2011 Earthquake. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Text reads 'Could the wrecking ball be used on structures outside Christchurch?' The cartoon shows Minister for the Reconstruction of Christchurch Gerry Brownlee as the wrecking ball on a crane; he says 'let the fun begin'. To one side is a large house crowded with people which represents 'the welfare state' and is surrounded by a barrier on which are printed the words 'Fiscal emergency'. Context - Gerry Brownlee is seen by many as rather too quick to demolish heritage buildings in his rush to rebuild Christchurch. The wrecking ball idea also suggests that the National government is likely to wreck the welfare state in its efforts to sort out economic problems. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

Despite the relatively low seismicity, a large earthquake in the Waikato region is expected to have a high impact, when the fourth-largest regional population and economy and the high density critical infrastructure systems in this region are considered. Furthermore, Waikato has a deep soft sedimentary basin, which increases the regional seismic hazard due to trapping and amplification of seismic waves and generation of localized surface waves within the basin. This phenomenon is known as the “Basin Effect”, and has been attributed to the increased damage in several historic earthquakes, including the 2010-2011 Canterbury earthquakes. In order to quantitatively model the basin response and improve the understanding of regional seismic hazard, geophysical methods will be used to develop shear wave velocity profiles across the Waikato basin. Active surface wave methods involve the deployment of linear arrays of geophones to record the surface waves generated by a sledge hammer. Passive surface wave methods involve the deployment of two-dimensional seismometer arrays to record ambient vibrations. At each site, the planned testing includes one active test and two to four passive arrays. The obtained data are processed to develop dispersion curves, which describe surface wave propagation velocity as a function of frequency (or wavelength). Dispersion curves are then inverted using the Geopsy software package to develop a suite of shear wave velocity profiles. Currently, more than ten sites in Waikato are under consideration for this project. This poster presents the preliminary results from the two sites that have been tested. The shear wave velocity profiles from all sites will be used to produce a 3D velocity model for the Waikato basin, a part of QuakeCoRE flagship programme 1.

Images, Alexander Turnbull Library

Two people stare at a demolition scene. The man thinks there must have been an earthquake but the woman advises him that it was the city council. Refers to plans to demolish three buildings in Wellington's Willis Street without public consultation. The buildings due for demolition are owned by Singaporean Grand Complex Properties, which plans eventually to build a multimillion-dollar high-rise on the site, reports stuff.co.nz. The Canterbury earthquake happened 4th September and as a result there has been a lot of discussion about the need to preserve historic buildings if at all possible. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

The Amuri Earthquake of September 1, 1888 (magnitude M = 6.5 to 6.8) occurred on the Hope River Segment of the Hope Fault west of Hanmer Plains. The earthquake was felt strongly in North Canterbury and North Westland and caused considerable property damage and landsliding in the Lower Hope Valley. However, damage reports and the spatial distribution of felt intensities emphasize extreme variations in seismic effects over short distances, probably due to topographic focusing and local ground conditions. Significant variations in lateral fault displacement occurred at secondary fault segment boundaries (side-steps and bends in the fault trace) during the 1888 earthquake. This historical spatial variation in lateral slip is matched by the Late Quaternary geomorphic distribution of slip on the Hope River Segment of the Hope Fault. Trenching studies at two sites on the Hope Fault have also identified evidence for five pre-historic earthquakes of similar magnitude to the 1888 earthquake and an average recurrence interval of 134 ± 27 years between events. Magnitude estimates for the 1888 earthquake are combined with a. strong ground motion attenuation expression to provide an estimate of potential ground accelerations in Amuri District during-future earthquakes on the Hope River Segment of the Hope Fault. The predicted acceleration response on bedrock sites within 20 km of the epicentral region is between 0.23 g and 0.34 g. The close match between the historic, inferred pre-historic and geomorphic distribution of lateral slip indicates that secondary fault segmentation exerts a strong structural control on rupture propagation and the expression of fault displacement at the surface. In basement rocks at depth the spatial variations in slip are inferred to be distributed within zones of pervasive cataclastic shear, on either side of the fault segment boundaries. The large variations in surface displacement across fault segment boundaries means that one must know the geometry of the fault in order to evaluate slip-rates calculated from individual locations. The average Late Quaternary slip-rate on the Hope Fault at Glynn Wye Station is between 15.5 mm/yr and 18.25 mm/yr and the rate on the subsidiary Kakapo Fault is between 5.0 mm/yr and 7.5 mm/yr. These rates have been determined from sites which are relatively free of structural complication.

Research papers, University of Canterbury Library

The November 2016 MW 7.8 Kaikōura Earthquake initiated beneath the North Culverden basin on The Humps fault and propagated north-eastwards, rupturing at least 17 faults along a cumulative length of ~180 km. The geomorphic expression of The Humps Fault across the Emu Plains, along the NW margin of Culverden basin, comprises a series of near-parallel strands separated by up to 3 km across strike. The various strands strike east to east-northeast and have been projected to mainly dip steeply to the south in seismic data (~80°). In this area, the fault predominantly accommodates right-lateral slip, with uplift and subsidence confined to releasing and restraining bends and step-overs at a range of scales. The Kaikōura event ruptured pre-existing fault scarps along the Emu Plains, which had been partly identified prior to the earthquake. Geomorphology and faulting expression of The Humps Fault on The Emu Plains was mapped, along with faulting related structures which did not rupture in the 2016 earthquake. Fault ruptures strands are combined into sections and the kinematic deformation of sections analysed to provide a moment tensor fault plane solution. This fault plane solution is consistent with the regional principal horizontal shortening direction (PHS) of ~115°, similar to seismic focal mechanism solutions of some of the nearby aftershocks of the Kaikōura earthquake, and similar to the adjacent Hope Fault. To constrain the timing of paleoseismic events, a trench was excavated across the fault where it crossed a late Quaternary alluvial fan. Mapping of stratigraphy exposed in the trench walls, and dating of variably deformed strata, constrains the pre-historic earthquake event history at the trench site. The available data provides evidence for at least three paleo-earthquakes within the last 15.1 ka, with a possible fourth (penultimate) event. These events are estimated to have occurred at 7.7-10.3 ka, 10.3-14.8 ka, and one or more events that are older than ~15.1 ka. Some evidence suggests an additional penultimate event between 1850 C.E and 7.7 ka. Time-integrated slip-rates at three locations on the fault are measured using paleo-channels as piercing points. These sites give horizontal slip rates of 0.57 ± 0.1 mm/year, 0.49 ± 0.1 mm/year and one site constrains a minimum of between 0.1 - 0.4 mm/year. Two vertical slip-rates are calculated to be constrained to a maximum of 0.2 ± 0.02 mm/year at one site and between 0.02 and 0.1 mm/year at another site. Prior to this study, The Humps fault had only been partially documented in reconnaissance level mapping in the district, and no previous paleoseismic or slip rate data had been reported. This project has provided a detailed fault zone tectonic geomorphic map and established new slip-rate and paleoseismic data. The results highlight that The Humps fault plays an important role in regional seismicity and in accommodating plate boundary deformation across the North Canterbury region.