Search

found 9 results

Images, eqnz.chch.2010

20130125_1749_1D3-400 Road Closed 1 The Lyttelton side of Evans Pass is closed (since the earthquake 23 months ago - 22/02/11). Prior to the road tunnel (through the Port Hills) opening in the early 1960s this was the main access road to the port of Lyttelton. #3072

Audio, Radio New Zealand

It's been a long road to recovery for one of Christchurch's biggest post-quake projects. Eight years after the route connecting Sumner to Lyttleton was blocked off by the earthquakes, the road through Evans Pass will reopen on Friday. Sumner residents will now have a second route into the suburb, as well as a renewed connection to Lyttleton. Sara Templeton is the councillor for Heathcote Ward, which covers Sumner, and speaks to Guyon Espiner.