Search

found 84 results

Videos, UC QuakeStudies

A video of Emily Marriot, from Corbel Construction, and Agata Bulksa, from Kirk Roberts Engineers, taking part in a boxing match as part of the Battle of the Rebuild fight night. The Battle of the Rebuild bought together major construction and engineering companies involved in the rebuild of Christchurch. The event raised more than $169,000 for the Aranui and Linwood College Breakfast Club, the Champion Centre, and the Canterbury Youth Development Programme Trust.

Other, National Library of New Zealand

Blog in which Sarah Miles comments on the post-earthquake reconstruction of Christchurch, critiquing the profit-driven model of private insurance and how it fails to protect citizens in times of disaster. Includes comment on the political situation and some guest posts.

Research papers, University of Canterbury Library

In recent Canterbury earthquakes, structures have performed well in terms of life safety but the estimated total cost of the rebuild was as high as $40 billion. The major contributors to this cost are repair/demolition/rebuild cost, the resulting downtime and business interruption. For this reason, the authors are exploring alternate building systems that can minimize the downtime and business interruption due to building damage in an earthquake; thereby greatly reducing the financial implications of seismic events. In this paper, a sustainable and demountable precast reinforced concrete (RC) frame system in which the precast members are connected via steel tubes/plates or steel angles/plates and high strength friction grip (HSFG) bolts is introduced. In the proposed system, damaged structural elements in seismic frames can be easily replaced with new ones; thereby making it an easily and quickly repairable and a low-loss system. The column to foundation connection in the proposed system can be designed either as fixed or pinned depending on the requirement of strength and stiffness. In a fixed base frame system, ground storey columns will also be damaged along with beams in seismic events, which are to be replaced after seismic events; whereas in a pin base frame only beams (which are easy to replace) will be damaged. Low to medium rise (3-6 storey) precast RC frame buildings with fixed and pin bases are analyzed in this paper; and their lateral capacity, lateral stiffness and natural period are scrutinized to better understand the pros and cons of the demountable precast frame system with fixed and pin base connections.

Images, eqnz.chch.2010

On a walk over to Hagley Park to great some shots of the wonderful Cherry Blossom I past by the Knox Church rebuild and found that the scaffolding has come down at last. It sure was shinning in the midday light. Victoria Street September 12, 2014 Christchurch New Zealand

Audio, Radio New Zealand

Topics - it's been described as the 'Downton Effect' - a revival of more formal dinner parties as the British try to bring back fine dining. Today we learned that insurance companies have completed just 15 per cent of rebuilds and 10 per cent of over-cap repairs more than three years after the Canterbury earthquakes. A series of rallies are being held in five Australian cities today by New Zealanders protesting against legislation which denies them rights to welfare. Commuters are cautiously optimistic about a radical revamp proposed for Wellington's rush-hour rail service.

Research Papers, Lincoln University

The coordination of actors has been a major focus for much of the research in the disaster relief humanitarian logistics discipline. While much of this literature focuses on the initial response phase, little has been written on the longer term recover phase. As the response phase transitions into the longer term recover phase the number and types of actors change from predominantly disaster relief NGOs to more commercial entities we argue that humanitarian values should still be part of the rebuild phase. It has been noted that humanitarian actors both cooperate and compete at the same time (Balcik, Beamon, Krejci, Muramatsu and Ramirez, 2010), in a form of behavior that can be described as ‘co-opetition’ (Nalebuff and Brandenburger, 1996). We use a case study approach to examine an organizational model used to coordinate civil and commercial actors for the rebuild of the civil infrastructure for Christchurch, New Zealand following a series of devastating earthquakes in 2010/11. For the rebuild phase we argue that ‘co-opetition’ is a key behaviour that allows the blending of humanitarian and commercial values to help communities rebuild to a new normal. While at this early stage our contribution is limited, we eventually hope to fully elaborate on an organisational model that has been created specifically for the tight coordination of commercial actors and its relevance to the rebuild phase of a disaster. Examining the behaviour of co-opetition and the structures that incentivise this behaviour offers insights for the humanitarian logistic field.

Videos, UC QuakeStudies

A video of an address by Scott Noyes, Energy Management Specialist for Schneider Electric NZ, at the 2014 Seismics and the City forum. This talk was part of the Building Connectivity section, and focused on collaborative and innovative initiatives relevant to the rebuild of Greater Christchurch.