BeckerFraserPhotos February 2012 photograph 0366
Images, UC QuakeStudies
A photograph of contractor vehicles parked in Cathedral Square. In the background is the ANZ building.
A photograph of contractor vehicles parked in Cathedral Square. In the background is the ANZ building.
A contractor with a roller stands in an enormous hole, and shouts up to a family standing at the top that it's now ready to be built on. Refers to efforts to compact soil in Christchurch to prevent further liquefaction following the Canterbury earthquakes. Quantity: 1 digital cartoon(s).
One landscape colour digital photograph taken on 28 April 2012 looking south from Cunningham Terrace, Lyttelton. The photograph shows a homemade figure of Humpty Dumpty with a bandaged head sitting on a fence on top of a retaining wall awaiting repair. Contractor involved in repair work The retaining walls above and below Cunningham Terrace wer...
The Canterbury earthquake sequence in New Zealand’s South Island induced widespread liquefaction phenomena across the Christchurch urban area on four occasions (4 Sept 2010; 22 Feb; 13 June; 23 Dec 2011), that resulted in widespread ejection of silt and fine sand. This impacted transport networks as well as infiltrated and contaminated the damaged storm water system, making rapid clean-up an immediate post-earthquake priority. In some places the ejecta was contaminated by raw sewage and was readily remobilised in dry windy conditions, creating a long-term health risk to the population. Thousands of residential properties were inundated with liquefaction ejecta, however residents typically lacked the capacity (time or resources) to clean-up without external assistance. The liquefaction silt clean-up response was co-ordinated by the Christchurch City Council and executed by a network of contractors and volunteer groups, including the ‘Farmy-Army’ and the ‘Student-Army’. The duration of clean-up time of residential properties and the road network was approximately 2 months for each of the 3 main liquefaction inducing earthquakes; despite each event producing different volumes of ejecta. Preliminary cost estimates indicate total clean-up costs will be over NZ$25 million. Over 500,000 tonnes of ejecta has been stockpiled at Burwood landfill since the beginning of the Canterbury earthquakes sequence. The liquefaction clean-up experience in Christchurch following the 2010-2011 earthquake sequence has emerged as a valuable case study to support further analysis and research on the coordination, management and costs of large volume deposition of fine grained sediment in urban areas.