Search

found 9 results

Articles, UC QuakeStudies

An example of the five year rebuild schedule map created as part of the prioritisation process detailing where and when construction would start. The data behind this map was updated every quarter.

Research papers, University of Canterbury Library

Damage to ceiling systems resulted in a substantial financial loss to building owners in the Canterbury earthquakes. In some buildings, collapse of ceilings could easily have resulted in severe injury to occupants. This paper summarizes the types of ceiling damage observed in the Canterbury earthquakes, and draws useful lessons from the observed performance of different types of ceiling systems. Existing ceiling manufacturing and installing practices/regulations in New Zealand are critically scrutinized to identify deficiencies, and measures are suggested to improve the practice so that the damage to ceilings and the resulting loss are minimized in future earthquakes.

Articles, UC QuakeStudies

A PDF copy of pages 104-105 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'SCAPE'. Image: Ash Keating, Gardensity, 2010/11, commissioned by SCAPE with generous support from Leighs Construction and Portabuild, installed outside Christchurch Art Gallery. Photo used with permission: SCAPE.

Research papers, The University of Auckland Library

Seismic retrofitting of unreinforced masonry buildings using posttensioning has been the topic of many recent experimental research projects. However, the performance of such retrofit designs in actual design level earthquakes has previously been poorly documented. In 1984 two stone masonry buildings within The Arts Centre of Christchurch received posttensioned seismic retrofits, which were subsequently subjected to design level seismic loads during the 2010/2011 Canterbury earthquake sequence. These 26 year old retrofits were part of a global scheme to strengthen and secure the historic building complex and were subject to considerable budgetary constraints. Given the limited resources available at the time of construction and the current degraded state of the steel posttension tendons, the posttensioned retrofits performed well in preventing major damage to the overall structure of the two buildings in the Canterbury earthquakes. When compared to other similar unretrofitted structures within The Arts Centre, it is demonstrated that the posttensioning significantly improved the in-plane and out-of-plane wall strength and the ability to limit residual wall displacements. The history of The Arts Centre buildings and the details of the Canterbury earthquakes is discussed, followed by examination of the performance of the posttension retrofits and the suitability of this technique for future retrofitting of other historic unreinforced masonry buildings. http://www.aees.org.au/downloads/conference-papers/2013-2/

Audio, Radio New Zealand

Hon PHIL HEATLEY to the Minister of Finance: What reports has he received on the economy – and especially on further signs of economic momentum in the regions and among manufacturers? Dr RUSSEL NORMAN to the Minister of Finance: How much did the Government's share sales in Mighty River Power, Meridian, and Air New Zealand raise, given that the Supplement to the 2010 Investment Statement of the Government of New Zealand projected that those sales would raise $5.18 billion? Hon DAVID PARKER to the Minister for ACC: How much did ACC invest in Pike River Coal Limited and in New Zealand Oil and Gas Limited over the last eight years, and how much has it made or lost in total on its investment in each company, taking into account share purchases, subscriptions and sales, dividends, and current share prices? Rt Hon WINSTON PETERS to the Minister of Māori Affairs: Does he stand by his statement "I know Māori want to talk about the place of the Treaty of Waitangi in our constitution, and how our legal and political systems can reflect tikanga Māori."; if so, why? Hon SHANE JONES to the Associate Minister of Finance: Is he satisfied with his performance in regard to his delegations as Associate Minister of Finance? JONATHAN YOUNG to the Minister for Building and Construction: What reports has he received regarding the state of the building and construction sector? GARETH HUGHES to the Minister for the Environment: Did the Environmental Protection Authority assess the full version of Anadarko's Discharge Management Plan and Emergency Response Plan as part of its evaluation of the company's Environmental Impact Assessment for the Deepwater Taranaki Well; if not, why not? Hon CLAYTON COSGROVE to the Minister of Finance: When, if at all, did Cabinet approve the timing of the Air New Zealand sell-down and what directions did Cabinet give the shareholding Ministers? NICKY WAGNER to the Minister of Housing: What steps is the Government taking to rebuild Christchurch's housing stock damaged or destroyed by the earthquakes? Hon DAMIEN O'CONNOR to the Minister for Primary Industries: Does he stand by his statement "The opportunity, and challenge, for our meat producers now is to add value to different cuts of meat and continue to sell the New Zealand story"; if so, why? IAN McKELVIE to the Minister of Local Government: How is the Government improving councils' financial reporting? DARIEN FENTON to the Minister of Labour: Does he stand by his statement that "I am especially keen to hear what affected parties have to say on the Part 6A proposals in the Bill, and will carefully consider their submissions and the recommendations of the select committee"?