Search

found 8 results

Images, UC QuakeStudies

A box containing drilling cores from soil sampling. The photographer comments, "These are the samples from drilling near my home. As you can see they are not so much samples as sand piles. The drill in a nearby street went down 20m and it was sand all the way. This is the box of samples from the ground level to 4.6m deep".

Images, UC QuakeStudies

Workers operate a drilling rig, sampling soil as part of EQC's geotechnical investigation of TC3 land. The photographer comments, "The work of getting 'soil' samples from all the areas marked as green/blue zones in Christchurch. These areas may be susceptible to liquefaction if a major earthquake occurs. The soil samples were a failure as all they found was sand".

Research papers, University of Canterbury Library

Earthquake Engineering is facing an extraordinarily challenging era, the ultimate target being set at increasingly higher levels by the demanding expectations of our modern society. The renewed challenge is to be able to provide low-cost, thus more widely affordable, high-seismic-performance structures capable of sustaining a design level earthquake with limited or negligible damage, minimum disruption of business (downtime) or, in more general terms, controllable socio-economical losses. The Canterbury earthquakes sequence in 2010-2011 has represented a tough reality check, confirming the current mismatch between societal expectations over the reality of seismic performance of modern buildings. In general, albeit with some unfortunate exceptions, modern multi-storey buildings performed as expected from a technical point of view, in particular when considering the intensity of the shaking (higher than new code design) they were subjected to. As per capacity design principles, plastic hinges formed in discrete regions, allowing the buildings to sway and stand and people to evacuate. Nevertheless, in many cases, these buildings were deemed too expensive to be repaired and were consequently demolished. Targeting life-safety is arguably not enough for our modern society, at least when dealing with new building construction. A paradigm shift towards damage-control design philosophy and technologies is urgently required. This paper and the associated presentation will discuss motivations, issues and, more importantly, cost-effective engineering solutions to design buildings capable of sustaining low-level of damage and thus limited business interruption after a design level earthquake. Focus will be given to the extensive research and developments in jointed ductile connections based upon controlled rocking & dissipating mechanisms for either reinforced concrete and, more recently, laminated timber structures. An overview of recent on-site applications of such systems, featuring some of the latest technical solutions developed in the laboratory and including proposals for the rebuild of Christchurch, will be provided as successful examples of practical implementation of performance-based seismic design theory and technology.

Images, UC QuakeStudies

The entrance to the West Avon building on Montreal Street. The photographer comments, "This very wonderful Art Deco heritage building in Christchurch had residents living in it until another visit from the building engineers re-re-checking for earthquake damage. Now it is fenced off and on the list for possible demolition".

Videos, UC QuakeStudies

A video about the 4 September 2010 earthquake, produced for the anniversary of the earthquake. The video includes footage of the earthquake damage to the Christchurch city centre, Darfield, Rolleston, and Hororata. It also includes footage of diggers clearing stock in the Canterbury Brewery on St Asaph Street, engineers checking buildings in town, and a fire on Worcester Street.

Videos, UC QuakeStudies

A video of Bill Robinson from Nikau Demolition Ltd talking about the demolition equipment the company is using in the Christchurch central city Red Zone. Robinson explains the need to check the welds of the crane arms each day, and the need for larger jaws on some demolition projects. He also explains the crane controls.