
A PDF copy of page 238 of the book Christchurch: The Transitional City Pt IV. The page documents the transitional project 'The Anglican Cathedral'. Note that images have been removed from the page for copyright reasons.
As seen from Hereford St over the demolition of the corner buildings.
A temporary (5year) construction of giant cardboard tubes to be in use until the new or restored Christ Church Cathedral is back in the Square
A PDF copy of pages 88-89 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Christchurch Transitional Cathedral'. Photos with permission: The Anglican Church
The temporary Transitional Cathedral, also known as the Cardboard Cathedral, under construction in Latimer Square.
A video of a public forum being held to discuss the Anglican Church's three options for the restoration of the ChristChurch Cathedral. The three options are restoring the original cathedral, reinterpreting the original cathedral in modern materials, or building a contemporary cathedral. The video includes footage of speeches by Bishop Victoria Matthews and RCP project manager Marcus Read. It also includes footage of Matthews, Read, and Warren and Mahoney architect Bill Gregory answering questions from the public.
The Cathedral
A couple of city blocks away from the now damaged Cathedral a temporary $4million cathedral has been built using large cardboard tubes and sheeting.
Damage to the north side of the cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral. Weeds can be seen growing around the war memorial in Cathedral Square.
An entry from Ruth Gardner's blog for 6 August 2013 entitled, "Captivating Cathedral".
An entry from Ruth Gardner's blog for 2 July 2013 entitled, "Canvas Cathedral?".
An entry from Ruth Gardner's blog for 13 February 2013 entitled, "Cardboard Cathedral".
A video of interviews with members of the public about which option they prefer for the restoration of the ChristChurch Cathedral. The options considered are those unveiled by the Anglican Church: the restoration option which would restore the current cathedral; the traditional option which would reinterpret the original cathedral in modern materials; and the contemporary option which would create a new building featuring a lightweight timber frame, more glazing, and modern interiors.
None
The temporary "Cardboard Cathedral" under construction.
“There are two classes of Christchurch postcards – those with the Cathedral and those without.” [1] The elegance of a lost age is captured in this exquisite photochrom post…
On the north east corner of Cathedral Square, the Commercial Hotel, owned by John Etherden Coker (1832 – 1894) was opened in 1863. The name Warner’s was not used until the hotel’s…
None
Cathedral of the Blessed Sacrameny aka Christchurch Basilica
Cathedral of the Blessed Sacrameny aka Christchurch Basilica
Cathedral of the Blessed Sacrameny aka Christchurch Basilica
Damage to the north side of the cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral.
A time-lapse video showing pedestrians using the temporary walkway through Cathedral Square. The video was filmed over the space of an hour.
Shows a sick and damaged Christchurch Anglican Cathedral in a hospital bed with two attendants. The Cathedral asks 'Can ya just pull the plug and let me die peacefully?'. Context refers to recent comments by Bishop Victoria Matthews that the Christchurch Cathedral is 'being left to die with no dignity' because of ongoing legal battles about its future. There has been ongoing debate and controversy over whether the Cathedral should be demolished, reconstructed or restored following damage suffered in the February 2011 Earthquake. Quantity: 1 digital cartoon(s).
Workers on the demolition site of the ANZ Cathedral Square branch.
None
A video of busker John Higby performing his Yo Yo Guy routine in Cathedral Square. The performance was part of a special World Buskers Festival show for workers in the Christchurch central city Red Zone.
The temporary (10 years?) and cheap ($4-6 million) Anglican Cathedral being built a few hundred meters away from the old stone structure that was the centre of Christchurch. Both buildings (the original and this) have caused a lot of controversy, many wanting the old stone one to be repaired (the church want to demolish it), and this as a waste ...
A time-lapse video of excavators demolishing the Heritage Tower in Cathedral Square. The video was filmed over three months.
The damaged (and once iconic Christchurch Cathedral) waits it's fate (repaired or demolish/rebuild) with the Millenium hotel in background.