Search

found 4 results

Audio, Radio New Zealand

When the 2011 Canterbury earthquakes struck, the region was hit with disaster on an unprecedented scale and the health system was challenged like never before. The injured needed immediate treatment, buildings and equipment were badly damaged, and yet those working in health system rallied to keep it going. Emergency Medicine specialist Dr Mike Ardagh and independent science writer Dr Joanne Deely have written a book, Rising from the Rubble, which tells the stories of those who were part of the health system response, and a record of the long-term issues that have been caused by it.

Audio, Radio New Zealand

Disaster teams in Papua New Guinea are still struggling to reach parts of the country hit hard by Monday's 7-point-5 earthquake: the Tongan branch of aid agency Live and Learn is still busy helping people patch up their homes two weeks on from the battering dished out by Cyclone Gita: Oceania leaders of the Anglican church gathering in Fiji will be looking at better preparing their people for natural disasters at a fono this week in Suva attended by the Archbishop of Canterbury; Pacific people call for more influence on global issues that affect the region's rapidly changing climate; a mould problem in Australia's refugee detention centre on Nauru posed a serious health threat.

Research papers, University of Canterbury Library

© 2018 Springer Nature B.V. This study compares seismic losses considering initial construction costs and direct-repair costs for New Zealand steel moment-resisting frame buildings with friction connections and those with extended bolted-end-plate connections. A total of 12 buildings have been designed and analysed considering both connection types, two building heights (4-storey and 12-storey), and three locations around New Zealand (Auckland, Christchurch, and Wellington). It was found that buildings with friction connections required design to a higher design ductility, yet are generally stiffer due to larger beams being required to satisfy higher connection overstrength requirements. This resulted in the frames with friction connections experiencing lower interstorey drifts on most floors but similar peak total floor accelerations, and subsequently incurring lower drift-related seismic repair losses. Frames with friction connections tended to have lower expected net-present-costs within 50 years of the building being in service for shorter buildings and/or if located in regions of high seismicity. None of the frames with friction connections in Auckland showed any benefits due to the low seismicity of the region.