Search

found 88 results

Images, eqnz.chch.2010

The earthquake re-pair work has started on the Knox Church on Bealey Avenue, August 14, 2013 Christchurch New Zealand. While building after building is torn down in Christchurch, plans are in place to ensure as much of a 131-year-old church is retained as possible. Knox Church on Bealey Avenue suffered major damage in the February 22 earthquak...

Articles, UC QuakeStudies

A transcript of Rev Darryl Tempero's interview for the Church in the Quakes Project. The interview was conducted by Melissa Parsons on 3 October 2012. At the time, Darryl Tempero was a Minister at Hope Presbyterian Hornby, the Presbyterian Earthquake Coordinator, and the Co-Chair of Christchurch Post Earthquake Churches' Forum.

Videos, UC QuakeStudies

A video of a public forum being held to discuss the Anglican Church's three options for the restoration of the ChristChurch Cathedral. The three options are restoring the original cathedral, reinterpreting the original cathedral in modern materials, or building a contemporary cathedral. The video includes footage of speeches by Bishop Victoria Matthews and RCP project manager Marcus Read. It also includes footage of Matthews, Read, and Warren and Mahoney architect Bill Gregory answering questions from the public.

Videos, UC QuakeStudies

A video of interviews with members of the public about which option they prefer for the restoration of the ChristChurch Cathedral. The options considered are those unveiled by the Anglican Church: the restoration option which would restore the current cathedral; the traditional option which would reinterpret the original cathedral in modern materials; and the contemporary option which would create a new building featuring a lightweight timber frame, more glazing, and modern interiors.

Images, eqnz.chch.2010

Knox Church earthquake repair/rebuild on a walk around Christchurch December 11, 2013 New Zealand. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... All about our ear...