Search

found 55 results

Images, UC QuakeStudies

A photograph of the earthquake-damaged Our City O-Tautahi Building on the corner of Worcester Street and Oxford Terrace. Steel bracing has been placed against the building to secure the brick walls. The bracing is supported by large concrete blocks. Wire fences have also been placed around the bottom of the building as a cordon. Scaffolding has been erected around the tower to the right.

Images, UC QuakeStudies

A photograph of emergency management personnel standing next to an earthquake-damaged house. The wall on the left side of the house has collapsed and the bricks have spilled into the driveway in front. Wooden bracing has been placed in between the house and the fence, with wires connecting the top of the bracing to the peak of the roof.

Images, UC QuakeStudies

A photograph of the earthquake damage to Munn's the Man store on Armagh Street. The outer wall of the top storey has collapsed, the bricks and other rubble spilling onto the car park below. Wire fences placed around the building have toppled over. Steel bracing has been set up inside the building to hold the roof up.

Images, UC QuakeStudies

A photograph of the Carlton Hotel on the corner of Papanui Road and Bealey Avenue. The top storey of the building's walls have crumbled, the bricks spilling onto the street below. Steel bracing has been placed against the building to the left.

Images, UC QuakeStudies

A photograph of the earthquake damage to Cranmer Courts on the corner of Montreal and Kilmore Streets. The brick walls of the gables have crumbled at the top, and wooden bracing has been placed against them to limit further damage.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Carlton Hotel on the corner of Papanui Road and Bealey Avenue. The wall of the top storey of the building has crumbled, and bricks have fallen onto the footpath. Wire fencing, road cones, and cordon tape have been placed around the building as a cordon. Scaffolding and steel bracing can be seen against the front of the building.