Christchurch Press 11 September 2014: Champion Canterbury Business Awards …
Articles, UC QuakeStudies
Page 2 of a Champion Canterbury Business Awards 2015 advertising feature in the Christchurch Press, published on Thursday 11 September 2014.
Page 2 of a Champion Canterbury Business Awards 2015 advertising feature in the Christchurch Press, published on Thursday 11 September 2014.
An entry from Deb Robertson's blog for 29 December 2014 entitled, "What I can promise my child for 2015..."The entry was downloaded on 3 November 2016.
An entry from Deborah Fitchett's blog for 7 May 2014, posted to Dreamwidth. The entry is titled, "In which she submits her hatred of Riccarton Road".The entry was downloaded on 14 April 2015.
In recent Canterbury earthquakes, structures have performed well in terms of life safety but the estimated total cost of the rebuild was as high as $40 billion. The major contributors to this cost are repair/demolition/rebuild cost, the resulting downtime and business interruption. For this reason, the authors are exploring alternate building systems that can minimize the downtime and business interruption due to building damage in an earthquake; thereby greatly reducing the financial implications of seismic events. In this paper, a sustainable and demountable precast reinforced concrete (RC) frame system in which the precast members are connected via steel tubes/plates or steel angles/plates and high strength friction grip (HSFG) bolts is introduced. In the proposed system, damaged structural elements in seismic frames can be easily replaced with new ones; thereby making it an easily and quickly repairable and a low-loss system. The column to foundation connection in the proposed system can be designed either as fixed or pinned depending on the requirement of strength and stiffness. In a fixed base frame system, ground storey columns will also be damaged along with beams in seismic events, which are to be replaced after seismic events; whereas in a pin base frame only beams (which are easy to replace) will be damaged. Low to medium rise (3-6 storey) precast RC frame buildings with fixed and pin bases are analyzed in this paper; and their lateral capacity, lateral stiffness and natural period are scrutinized to better understand the pros and cons of the demountable precast frame system with fixed and pin base connections.