The 4th of September 2010 Mw 7.1 Darfield (Canterbury) earthquake had generated significant ground shaking within the Christchurch Central Business District (CBD). Despite the apparently significant shaking, the observed structural damage for pre-1970s reinforced concrete (RC) buildings was indeed limited and lower than what was expected for such typology of buildings. This paper explores analytically and qualitatively the different aspects of the "apparent‟ good seismic performance of the pre-1970s RC buildings in the Christchurch CBD, following the earthquake reconnaissance survey by the authors. Damage and building parameters survey result, based on a previously established inventory of building stock of these non-ductile RC buildings, is briefly reported. From an inventory of 75 buildings, one building was selected as a numerical case-study to correlate the observed damage with the non-linear analyses. The result shows that the pre-1970s RC frame buildings performed as expected given the intensity of the ground motion shaking during the Canterbury earthquake. Given the brittle nature of this type of structure, it was demonstrated that more significant structural damage and higher probability of collapse could occur when the buildings were subjected to alternative input signals with different frequency content and duration characteristics and still compatible to the seismicity hazard for Christchurch CBD.
Known by the locals as the "Manager's House" of the large brick and tile works which was situated nearby. Established by the Austin brothers in 1863 the brickworks were named after the town of Farnley in Yorkshire England, from where the family had come. I remember the brickworks as a child and I think they were demolished in the 1970's. Very sa...
Known by the locals as the "Owner's House" of the large Farnley Brick and Tile Works which was situated nearby. Established by the Austin brothers in 1863 the brickworks were named after the town of Farnley in Yorkshire England, from where the family had come. I remember the brickworks as a child and I think they were demolished in the 1970's. V...
It is no secret that there is a problem with the suburb of Aranui. Developed in the 1950s,
Aranui and neighbouring Wainoni are an example of the large-scale, state-funded
subdivisions of the time, yet, unlike similar developments in the North Island, they have
received little to no attention from researchers. In light of the recent Canterbury
earthquakes, this dissertation aims to trace the evolution of these suburbs until the 1970s
and act as the first stage of a more comprehensive review of state housing and the
Aranui/Wainoni area. By critically reviewing existing literature on state housing and housing
policy in New Zealand, as well as undertaking archival research, this dissertation addresses
the international influences on state housing in New Zealand generally and the development
of the Aranui and Wainoni area more specifically in order to provide a foundation for
answering the question, "What went so wrong?"
An as-built reinforced concrete (RC) frame building designed and constructed according to pre-1970s code design construction practice has been recently tested on the shake table at the University of Canterbury. The specimen, 1/2.5 scaled version of the original prototype, consists of two 3-storey 2-bay asymmetric frames in parallel, one interior and one exterior, jointed together by transverse beams and floor slabs. Following the benchmark test, a retrofit intervention has been proposed to rehabilitate the tested specimen. In this paper, detailed information on the assessment and design of the seismic retrofit procedure using GFRP (glass fibre reinforced polymer) materials is given for the whole frame. Hierarchy of strength and sequence of events (damage mechanisms) in the panel zone region are evaluated using a moment-axial load (M-N) interaction performance domain, according to a performance-based retrofit philosophy. Specific limit states or design objectives are targeted with attention given to both strength and deformation limits. In addition, an innovative retrofit solution using FRP anchor dowels for the corner beam-column joints with slabs is proposed. Finally, in order to provide a practical tool for engineering practice, the retrofit procedure is provided in a step-by step flowchart fashion.