Search

found 3636 results

Audio, Radio New Zealand

'Designed by an incompetent engineer, supervised by an irresponsible engineer and constructed by a fake engineer'. Those were the views of the Christchurch Earthquake Families Group, heard today, at the first - and only - disciplinary hearing to be held against anyone who designed and built the CTV building in Christchurch.

Audio, Radio New Zealand

Stonemason Mark Whyte puts sculpting commissions aside in order to respond to the Christchurch earthquakes and save classic street facades from the 1870s. Across the Red Zone and 3 generations of the Aires family- Bob, Rob and Suzie are at work on the Heritage Hotel which were the old government buildings.

Images, Alexander Turnbull Library

The cartoon, which looks like a woodcut depicts a muscled workman wearing a black singlet; his arms are folded and the fingers of one hand are crossed. On his arms are tattoos of a helmet and pick, a '$' symbol, a petrol pump, and a high magnitude earthquake graph. Behind him are buildings, including the Christchurch Cathedral, damaged following the Christchurch earthquake of 22 February 2011. Below the cartoon are the words 'Apologies to Nigel Brown' - a black singlet is a recurring motif in the work of New Zealand artist Nigel Brown. Quantity: 1 digital cartoon(s).

Research papers, The University of Auckland Library

Following a damaging earthquake, the immediate emergency response is focused on individual collapsed buildings or other "hotspots" rather than the overall state of damage. This lack of attention to the global damage condition of the affected region can lead to the reporting of misinformation and generate confusion, causing difficulties when attempting to determine the level of postdisaster resources required. A pre-planned building damage survey based on the transect method is recommended as a simple tool to generate an estimate of the overall level of building damage in a city or region. A methodology for such a transect survey is suggested, and an example of a similar survey conducted in Christchurch, New Zealand, following the 22 February 2011 earthquake is presented. The transect was found to give suitably accurate estimates of building damage at a time when information was keenly sought by government authorities and the general public. VoR - Version of Record

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. More offices".

Audio, Radio New Zealand

The debt stricken state-owned enterprise Solid energy is in crisis talks with the Treasury and its banks, two years after the Christchurch earthquakes, insurance companies are blamed for delays in the rebuild, and in dateline pacific Papua New Guinea is building up its military to build roads.