Images, UC QuakeStudies

A photograph of a badly-damaged building on Manchester Street, which previously housed the Treehouse bar and nightclub. The roof and second storey of the building have been temporarily repaired and the building is fenced off.

Images, UC QuakeStudies

A fire engine driving past the damaged Provincial Council Legislative Chamber on Durham Street. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September earthquake.

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. My desk".

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February 2011 earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February 2011 earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

The Lyttelton Coffee Company building on London Street in Lyttelton is weatherproofed with black tarpaulins. The spray-painted signs guide customers to Samo Coffee Lounge, a cafe run by the staff of Lyttelton Coffee Company while the building is being repaired.

Articles, UC QuakeStudies

An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.

Images, UC QuakeStudies

An aerial photograph of the PricewaterhouseCoopers building. The photograph is captioned by BeckerFraserPhotos, "PricewaterhouseCoopers building at 119 Armagh Street. Its status is uneconomic to repair, so it will be demolished. Copthorne Central is visible behind it and will be staying".

Images, UC QuakeStudies

Jess Hollis, a member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. My desk with Jess behind".

Images, UC QuakeStudies

A crane beside the boiler chimney in the University of Canterbury's Facilities Management yard. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Inspection and repairs to the University's boiler system. It's getting cooler, we'll need heat soon - but we need accessible buildings first".

Images, UC QuakeStudies

Jess Hollis, a member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. Jess, with my desk behind".

Images, UC QuakeStudies

Civil Defence staff walking down Durham Street, a fire engine behind them. Beside them, the damaged Provincial Council Legislative Chamber can be seen. The building's roof and walls have collapsed, as has the scaffolding that had been erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

Buckled columns on a house in Wainoni. The photographer comments, "A Sunday afternoon ride to New Brighton, then back via Aranui, Wainoni, Dallington, and Richmond. Not a cheerful experience. 'We've decided you're a repair, not a rebuild after all'. Actually, I think these houses might be red zoned".

Images, UC QuakeStudies

Members of the University of Canterbury's E-Learning team Susan Tull and Nick Ford in their temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. Susan and Nick settle in".

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Crack repairs on the Rendezvous Hotel in Gloucester Street. Cracks have been injected with epoxy resin using syringes. The epoxy resin leaves a peak around each hole which will be ground down to a smooth surface. The wall will then be repainted. This process actually makes the wall stronger than it was originally.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Research papers, University of Canterbury Library

Asset management in power systems is exercised to improve network reliability to provide confidence and security for customers and asset owners. While there are well-established reliability metrics that are used to measure and manage business-as-usual disruptions, an increasing appreciation of the consequences of low-probability high-impact events means that resilience is increasingly being factored into asset management in order to provide robustness and redundancy to components and wider networks. This is particularly important for electricity systems, given that a range of other infrastructure lifelines depend upon their operation. The 2010-2011 Canterbury Earthquake Sequence provides valuable insights into electricity system criticality and resilience in the face of severe earthquake impacts. While above-ground assets are relatively easy to monitor and repair, underground assets such as cables emplaced across wide areas in the distribution network are difficult to monitor, identify faults on, and repair. This study has characterised in detail the impacts to buried electricity cables in Christchurch resulting from seismically-induced ground deformation caused primarily by liquefaction and lateral spread. Primary modes of failure include cable bending, stretching, insulation damage, joint braking and, being pulled off other equipment such as substation connections. Performance and repair data have been compiled into a detailed geospatial database, which in combination with spatial models of peak ground acceleration, peak ground velocity and ground deformation, will be used to establish rigorous relationships between seismicity and performance. These metrics will be used to inform asset owners of network performance in future earthquakes, further assess component criticality, and provide resilience metrics.

Images, UC QuakeStudies

A view looking south down Durham Street. Two fire engines are driving north, and a pair of construction workers are walking up the road. Behind them is the damaged Provincial Council Legislative Chambers. The building's walls and roof have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.