Search

found 399 results

Audio, Radio New Zealand

A new study suggests young Maori wahine are being let down by the health system, because of inadequate information to help them find a midwife; A South Island marae has accepted a donation to repair its wharekai damaged during the 2011 Canterbury earthquakes; About 750 Maori and Pasifika Auckland tertiary students will celebrate their academic achievement.

Audio, Radio New Zealand

It's seven years today since Christchurch was rocked by the magnitude 6.3 earthquake. It killed 185 people, injured thousands more and led to whole suburbs and most of the central city being demolished. Seven years on, the rebuild is still underway and some residents are still struggling to get the repairs they want.

Research papers, University of Canterbury Library

This paper presents preliminary results of an experimental campaign on three beam-column joint subassemblies extracted from a 22-storey reinforced concrete frame building constructed in late 1980s at the Christchurch’s Central Business District (CBD) area, damaged and demolished after the 2010-2011 Canterbury earthquakes sequence (CES). The building was designed following capacity design principles. Column sway (i.e., soft storey) mechanisms were avoided, and the beams were provided with plastic hinge relocation details at both beam-ends, aiming at developing plastic hinges away from the column faces. The specimens were tested under quasi-static cyclic displacement controlled lateral loading. One of the specimens, showing no visible residual cracks was cyclically tested in its as-is condition. The other two specimens which showed residual cracks varying between hairline and 1.0mm in width, were subjected to cyclic loading to simulate cracking patterns consistent with what can be considered moderate damage. The cracked specimens were then repaired with an epoxy injection technique and subsequently retested until reaching failure. The epoxy injection techniques demonstrated to be quite efficient in partly, although not fully, restoring the energy dissipation capacities of the damaged specimens at all beam rotation levels. The stiffness was partly restored within the elastic range and almost fully restored after the onset of nonlinear behaviour.

Images, eqnz.chch.2010

Further damage to the bank following the two quakes on 23/12/11. The sewer line broke here and was repaired (patched) by council staff on Christmas Eve. It is hard to beleve that this rock wall was level with the land here, before any of the quakes.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding. Builders repair the master bedroom where a large brick chimney came through the room narrowly missing the Cotterills and totally obliterating their bed".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding. Builders repair the master bedroom where a large brick chimney came through the room narrowly missing the Cotterills and totally obliterating their bed".

Audio, Radio New Zealand

A new study suggests young Maori wahine are being let down by the health system, because of inadequate information to help them find a midwife; A South Island marae has accepted a donation to repair its wharekai damaged during the 2011 Canterbury earthquakes; About 750 Maori and Pasifika Auckland tertiary students will celebrate their academic achievement this week.

Research papers, University of Canterbury Library

This paper presents the probabilistic seismic performance and loss assessment of an actual bridge– foundation–soil system, the Fitzgerald Avenue twin bridges in Christchurch, New Zealand. A two-dimensional finite element model of the longitudinal direction of the system is modelled using advanced soil and structural constitutive models. Ground motions at multiple levels of intensity are selected based on the seismic hazard deaggregation at the site. Based on rigorous examination of several deterministic analyses, engineering demand parameters (EDP’s), which capture the global and local demand, and consequent damage to the bridge and foundation are determined. A probabilistic seismic loss assessment of the structure considering both direct repair and loss of functionality consequences was performed to holistically assess the seismi risk of the system. It was found that the non-horizontal stratification of the soils, liquefaction, and soil–structure interaction had pronounced effects on the seismic demand distribution of the bridge components, of which the north abutment piles and central pier were critical in the systems seismic performance. The consequences due to loss of functionality of the bridge during repair were significantly larger than the direct repair costs, with over a 2% in 50 year probability of the total loss exceeding twice the book-value of the structure.

Videos, UC QuakeStudies

A video about the discovery of a historic tramline on North Avon Road. The video includes an interview with Brent Leersynder, a site engineer for SCIRT, and Steve Timpson, site foreman for SCIRT. The SCIRT team found the tramline while repairing the damaged wastewater system under North Avon Road in May.

Images, Alexander Turnbull Library

The cartoon shows an enormous ball of red tape and all around frustrated workers carry away their ladders and tools. Context - Three months after a quake that scored a direct hit under Christchurch, many residents are struggling with mountains of paperwork required to get their homes repaired and rebuilt. Reference numbers, codes and Pin numbers permeate our daily living now as we deal with the aftermath of two major earthquakes in six months. People feel they are lucky that they have the EQC pot to draw on, but there are a lot of complexities, anomalies and frustrations. (BBC News 21 May 2011) Colour and black and white versions available Quantity: 2 digital cartoon(s).

Images, Alexander Turnbull Library

A woman says to a builder 'Christchurch people will really appreciate your help to rebuild - What you construct looks like it's already been hit by an earthquake'. They are standing in front of a very shoddily-built cottage and the garden is festooned with litter. Context - After the Christchurch earthquakes there is a huge emphasis on fast rebuilding with the potential for below standard results.. Quantity: 1 digital cartoon(s).

Other, National Library of New Zealand

An intermittent collaboration between the Centre of Contemporary Art and a series of local artists looking to present new work which explores the realities of the post-earthquake cultural landscape in Christchurch. The artworks by Ed Lust, Sam Eng, and Robyn Wester each utilise the empty window space of the window and carport of the damaged COCA building which is awaiting repair.

Images, UC QuakeStudies

Glass panels with brass surrounds, stacked inside a building. The photographer comments, "These were brass dividers that were brought inside the building two years ago after the Christchurch earthquake. They have been sitting there abandoned in a restaurant that will be either repaired and reopened at a later date or demolished like the many others of its kind".

Audio, Radio New Zealand

An elderly Christchurch couple are crying foul over EQC's site visit policy under alert level two. EQC says the measures, outlined in emails to clients, are crucial for staff and customer safety. But John and Frances van Petegem, who have been waiting years to have botched earthquake repairs put right, say EQC's rules are causing further delays and stress. Nick Truebridge has the story.

Audio, Radio New Zealand

A report commissioned by the Ministry of Health has found Canterbury residents are unlikely to suffer any health risks from asbestos exposure during the canterbury earthquake repairs. The Report is a review of Scientific Evidence of Non Occuptional Risks - and was convened by the Royal Society and the Prime Minister's Chief Science Advisor. Sir David Skegg, president of the Royal Society of New Zealand and Dr Alistair Humphrey, Canterbury Medical Officer of Health.

Audio, Radio New Zealand

Many Christchurch trades people are refusing to carry out quake repairs unless the homeowner agrees to pay the bill, saying it takes too long to get the money out of the Earthquake Commission. Some contractors say they still haven't been paid for jobs done after the quake in September and the amount of debt some businesses are carrying are putting them in jeopardy.

Audio, Radio New Zealand

A year after the first earthquake on 4 September 2010, aftershocks continue to be felt in Canterbury, and they're not always seismic ones. When buildings collapse or are cordoned off, or even just closed for repairs - what happens to the lives and livelihoods of those who used to fill them with noise and energy? Kris Vavasour returns to Lyttelton to catch up with performers and friends, to hear about life in an altered landscape.

Images, eqnz.chch.2010

The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.

Audio, Radio New Zealand

The Earthquake Commission has settled with a Christchurch homeowner, just days before their test case was due to be heard at the High Court. Jamie Gibling used his KiwiSaver to buy his first family home in New Brighton after the quakes, believing it had been properly repaired. He later learned the repairs were botched and would cost $300,000 to fix. His "onsold" test case was supposed to be heard on Monday to clarify who was liable. But today EQC announced it had reached a settlement with the family and that agreement would provide a framework for the 54 other claimants also with Shine Lawyers. Finance and EQC Minister Grant Robertson last week announced an "onsold" settlement kitty of $300 million for the next 12 months but legal experts working with claimants have told Checkpoint it could cost taxpayers much much more. EQC's Deputy Chief Executive is Renee Walker. On Thursday she came into the studio and Lisa Owen asked her if the Giblings got what they asked for and if the 54 others who signed up to the class action would get the same.

Images, Alexander Turnbull Library

Shows Christchurch's Anglican cathedral receiving extensive treatment including blood, ambulances, scaffold and signs reading 'save!' In the background Christchurch's Catholic Cathedral says it wants its share of attention as well. Context: The focus of repairing the Christchurch Anglican cathedral appeared to draw focus and resources from the equally historic and damaged Catholic Cathedral. Quantity: 1 digital cartoon(s).

Images, eqnz.chch.2010

The ticket office at Lancaster Park (AMI Stadium), not used since the February 2011 earthquake. Windows broken and door boarded up. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired.

Images, eqnz.chch.2010

Only two of 20 houses left in the Rawhiti Earthquake Village. This from the sign on perimeter fence: "Since 2011, Rawhiti Domain has been used to provide temporary accommodation for those affected by the Canterbury earthquakes. Over 200 households have used the 20 houses while their own homes have been repaired or rebuilt. The demand for acco...

Images, Alexander Turnbull Library

Minister for Christchurch Recovery, Gerry Brownlee drives a huge tractor among debris that spells out 'Due Process' and says 'In order to get Christchurch back on its feet again we have to bring parliament to its knees. Context - The minister says he is happy with the speed of the work being done, as he wants tomake sure those involved in the rebuild portion of the recovery effort are well prepared. The bill establishes the Canterbury Earthquake Recovery Authority (Cera) and empowers it to lead reconstruction efforts in Christchurch. It gives Cera specific powers to get information from any source, to requisition and build on land and to carry out demolitions. It can also take over local authorities if they are not working effectively on recovery work. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

The Aromaunga Baxters Flowers nursery in Heathcote, Christchurch sits right above the point where the earthquake struck on 22 February 2011. The greenhouses on the steep slopes of the Port Hills, as well as a big old villa and other brick buildings were badly damaged. Ten years on co-owner John Baxter says the earthquake damage is still being repaired, but sales have been boosted by a lack of imported flowers due to Covid-19 restrictions.

Images, UC QuakeStudies

A proposed design by John Raven for a new cathedral, tied to a cordon fence. Clarendon Tower can be seen in the background. The photographer comments, "Someone is asking for designs for a new Christchurch Cathedral after it was announced that the old historical building will not be repaired, to be put on the fences through which people can see the de-construction of the old one. This design looks a great one to me".

Videos, UC QuakeStudies

A video of an interview with Tracey McKeefrey about her leaky house. McKeefrey and her family have been living in the house since the 22 February 2011 earthquake, despite the fact that over 300 litres of water comes through the house every wet day. The property has been classified as TC3 but the family still does not know if it will be repaired or rebuilt.

Images, UC QuakeStudies

A digitally manipulated image of furniture and machinery. The photographer comments, "This furniture restoration company got caught in the middle of the Christchurch earthquake and lost a whole wall. After constant exposure to the elements everything now needs a bit of restoration. They are now working in a different part of Christchurch, but their past can still be seen".