Search

found 278 results

Images, UC QuakeStudies

An aerial photograph of the PricewaterhouseCoopers building. The photograph is captioned by BeckerFraserPhotos, "PricewaterhouseCoopers building at 119 Armagh Street. Its status is uneconomic to repair, so it will be demolished. Copthorne Central is visible behind it and will be staying".

Images, UC QuakeStudies

Jess Hollis, a member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. My desk with Jess behind".

Images, UC QuakeStudies

A crane beside the boiler chimney in the University of Canterbury's Facilities Management yard. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Inspection and repairs to the University's boiler system. It's getting cooler, we'll need heat soon - but we need accessible buildings first".

Images, UC QuakeStudies

Jess Hollis, a member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. Jess, with my desk behind".

Images, UC QuakeStudies

Civil Defence staff walking down Durham Street, a fire engine behind them. Beside them, the damaged Provincial Council Legislative Chamber can be seen. The building's roof and walls have collapsed, as has the scaffolding that had been erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

Buckled columns on a house in Wainoni. The photographer comments, "A Sunday afternoon ride to New Brighton, then back via Aranui, Wainoni, Dallington, and Richmond. Not a cheerful experience. 'We've decided you're a repair, not a rebuild after all'. Actually, I think these houses might be red zoned".

Images, UC QuakeStudies

Members of the University of Canterbury's E-Learning team Susan Tull and Nick Ford in their temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. Susan and Nick settle in".

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Crack repairs on the Rendezvous Hotel in Gloucester Street. Cracks have been injected with epoxy resin using syringes. The epoxy resin leaves a peak around each hole which will be ground down to a smooth surface. The wall will then be repainted. This process actually makes the wall stronger than it was originally.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

A view looking south down Durham Street. Two fire engines are driving north, and a pair of construction workers are walking up the road. Behind them is the damaged Provincial Council Legislative Chambers. The building's walls and roof have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

Scaffolding that has been constructed on the Manchester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. Masonry has fallen from one of the building's gables, and the resultant gap has been weather proofed with plywood and a tarpaulin. The site has been enclosed in a safety fence that cuts off one lane of the road.

Articles, UC QuakeStudies

A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.

Images, UC QuakeStudies

Scaffolding that has been constructed on the Manchester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. Masonry has fallen from one of the building's gables, and the resultant gap has been weather proofed with plywood and a tarpaulin. The site has been enclosed in a safety fence that cuts off one lane of the road.

Images, UC QuakeStudies

Scaffolding that has been constructed on the Manchester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. Masonry has fallen from one of the building's gables, and the resultant gap has been weather proofed with plywood and a tarpaulin. The site has been enclosed in a safety fence that cuts off one lane of the road.

Images, UC QuakeStudies

The damaged Cranmer Centre on the corner of Montreal and Armagh Streets shortly after the 22 February 2011 earthquake. The east wall of the building has crumbled onto the street and a man in a hard hat and high-visibility vest is directing people around it. There is scaffolding on the south side of the building from repair works after the 4 September 2010 earthquake. The gable in the background has also collapsed.

Images, UC QuakeStudies

A photograph of Marie Hudson working on Crack'd for Christchurch's armchair artwork.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."

Images, UC QuakeStudies

A photograph of Helen Campbell working on Crack'd for Christchurch's armchair artwork.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."

Images, UC QuakeStudies

A photograph of Helen Campbell and Marie Hudson working on Crack'd for Christchurch's armchair artwork.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-completed mosaic on their armchair.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."

Images, UC QuakeStudies

A photograph of Helen Campbell working on Crack'd for Christchurch's armchair artwork.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."

Images, UC QuakeStudies

A view looking south down Durham Street during the aftermath of the 22 February 2011 earthquake. On the left are the ruins of the historic stone Provincial Council Legislative Chamber. The building's roof and walls have already collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake. An aftershock has caused masonry to dislodge from the building, sending dust into the air.

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-completed mosaic on their armchair.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."

Images, UC QuakeStudies

A view looking south down Durham Street during the aftermath of the 22 February 2011 earthquake. On the left are the ruins of the historic stone Provincial Council Legislative Chamber. The building's roof and walls have already collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake. An aftershock has caused masonry to dislodge from the building, sending dust into the air.

Images, UC QuakeStudies

The ruins of the historic Durham Street Methodist Church in the aftermath of the 22 February 2011 earthquake. The only parts of the building still upright are those supported by steel braces placed there after the 4 September 2010 earthquake to strengthen the building as it awaited repairs. Rubble has spilled out onto the street, knocking over the safety fences that were also erected after September. Silt from liquefaction has covered the road around the church.