A photograph of members of the Wellington Emergency Management Office Emergency Response Team examining collapsed scaffolding on Liverpool Street.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer putting the roof together.
Photo of Helen Sellwood's office in Level 3 of Aoraki Building taken by Neville Weavers, 1 April 2011.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of a map of the Greendale fault line in Canterbury used by volunteers from the Wellington Emergency Management Office.
A photograph of a minister from the International Disaster Relief Team giving a volunteer from the Wellington Emergency Management Office a massage.
A photograph of the old post office building on the corner of Tuam Street and High Street which housed Alice in Videoland before the 22 February 2011 earthquake.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Three volunteers putting the roof together.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team team on the footpath of Worcester Street near Latimer Square.
A photograph of members of the Wellington Emergency Management Office in a van. Out the window is an earthquake-damaged building.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men nail the walls together.
Photo of damage to Outside Laurie McCullum's office on Aoraki 4th Floor, taken by Natasha Sitarz.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team walking down Worcester Street towards Latimer Square.
Workers nail recycled metal sheets to the outside of the 10m2 office building, soon to be Gap Filler's Headquarters.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
Photo of damage to mobiles shelves in Records Office, taken by Glenda Duffell on 6 September 2010.
A photograph of students of St Bede's College standing at the entrance to the school. A sign directs visitors to the St Bede's College Office and the Marian College Office.
A photograph of children's play equipment on the site of the Gap Filler office. In the background, a mural reads, "The things which I have seen I now can see no more".
A sign describing Gap Filler's temporary office in Sydenham.
The old Public Trust Office building on Oxford Terrace.
Members of the University of Canterbury's E-Learning team admire the view from their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. South window of our office. Our view looks out to the Port Hills and around to the south west, towards Halswell and Lincoln".
Furniture and equipment packed up ready for the University of Canterbury's E-Learning team's move to their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Waiting for the movers. Our office is packed into orange crates, everything is labelled, where are the movers?".
Photograph captioned by BeckerFraserPhotos, "The Historic Post Office in Cathedral Square from the site of the Regent Theatre with the new Telecom building to the right".
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.