Search

found 522 results

Images, eqnz.chch.2010

www.youtube.com/watch?v=SPXqb7k4azU Details inside a half demolished theatre in central Christchurch. November, 2012. Christchurch, NZ. (c)Mike Brebner. All rights reserved.

Images, UC QuakeStudies

A proposed design by John Raven for a new cathedral, tied to a cordon fence. Clarendon Tower can be seen in the background. The photographer comments, "Someone is asking for designs for a new Christchurch Cathedral after it was announced that the old historical building will not be repaired, to be put on the fences through which people can see the de-construction of the old one. This design looks a great one to me".

Images, UC QuakeStudies

A digitally manipulated photograph of broken windows on Shadbolt House. The photographer comments, "This was close to the start of the demolition of the earthquake damaged Shadbolt House building in the Port of Lyttelton, New Zealand. In the bright sun the glass reflected the blue sky, but the broken windows only reflected the blackness of the interior of the empty broken building".

Images, UC QuakeStudies

A photograph of crowds at the LUXCITY event. The photograph shows an installation on Worcester Street, with the new Press building in the background. The installation is titled "Murmur".

Audio, Radio New Zealand

American social-psychologist Tara Powell on the challenges of building confidence in children who have been traumatised by a natural disaster, such as Hurricane Katrina or the Christchurch earthquake.

Research papers, The University of Auckland Library

During the Christchurch earthquake of February 2011, several midrise buildings of Reinforced Concrete Masonry (RCM) construction achieved performance levels in the range of life safety to near collapse levels. These buildings were subjected to seismic demands higher than the building code requirements of the time and higher than the current New Zealand Loadings Standard (NZS-1170.5:2004). Structural damage to these buildings has been documented and is currently being studied to establish lessons to be learned from their performance and how to incorporate these lessons into future RCM design and construction practices. This paper presents a case study of a six story RCM building deemed to have reached the near collapse performance level. The RCM walls on the 2nd floor failed due to toe crushing reducing the building’s lateral resistance in the east-west direction. A nonlinear dynamic analysis on a 3D model was conducted to simulate the development of the governing failure mechanism. Preliminary analysis results show that the damaged walls were initially under large compression forces from gravity loads which caused increase in their lateral strength and reduced their ductility. After toe crushing failure developed, axial instability of the model was prevented by a redistribution of gravity loads.

Videos, UC QuakeStudies

A video of people protesting the demolition of the Cranmer Courts on Armagh Street. In the background, an excavator is being used to demolish the building. Earlier in the day a man was arrested on a trespassing charge for climbing the fence.