A story submitted by J Bell to the QuakeStories website.
Summary of oral history interview with Irene Cleary about her experiences of the Canterbury earthquakes.
A story submitted by Tim Kerr to the QuakeStories website.
A story submitted by Hebe Kearney to the QuakeStories website.
A story submitted by Nicky to the QuakeStories website.
Summary of oral history interview with Wendy Hawke about her experiences of the Canterbury earthquakes.
An entry from Deb Robertson's blog for 9 July 2013 entitled, "Sometimes the memories just come....".
A pdf transcript of Liz Kivi's second earthquake story, captured by the UC QuakeBox Take 2 project. Interviewer: Joshua Black. Transcriber: Josie Hepburn.
Summary of oral history interview with Loretta Rhodes about her experiences of the Canterbury earthquakes.
Transcript of Captain Long John Knickers's (alias Kerry McCammon) earthquake story, captured by the UC QuakeBox project.
An edited copy of the pdf transcript of Michelle's second earthquake story, captured by the UC QuakeBox Take 2 project. At the participant's request, parts of this transcript have been redacted. Interviewer: Jennifer Middendorf. Transcriber: Josie Hepburn.
A pdf transcript of Part 1 of Tracey Waiariki's second earthquake story, captured by the UC QuakeBox Take 2 project. Interviewer: Lucy Denham. Transcriber: Lucy Denham.
A pdf transcript of Vic Bartley's second earthquake story, captured by the UC QuakeBox Take 2 project. Interviewer: Samuel Hope. Transcriber: Sarah Woodfield.
New Zealand's devastating Canterbury earthquakes provided an opportunity to examine the efficacy of existing regulations and policies relevant to seismic strengthening of vulnerable buildings. The mixed-methods approach adopted, comprising both qualitative and quantitative approaches, revealed that some of the provisions in these regulations pose as constraints to appropriate strengthening of earthquake-prone buildings. Those provisions include the current seismic design philosophy, lack of mandatory disclosure of seismic risks and ineffective timeframes for strengthening vulnerable buildings. Recommendations arising from these research findings and implications for pre-disaster mitigation for future earthquake and Canterbury's post-disaster reconstruction suggest: (1) a reappraisal of the requirements for earthquake engineering design and construction, (2) a review and realignment of all regulatory frameworks relevant to earthquake risk mitigation, and (3) the need to develop a national programme necessary to achieve consistent mitigation efforts across the country. These recommendations are important in order to present a robust framework where New Zealand communities such as Christchurch can gradually recover after a major earthquake disaster, while planning for pre-disaster mitigation against future earthquakes. AM - Accepted Manuscript
An entry from Jennifer Middendorf's blog for 16 March 2011 entitled, "Hotdesking".
A story submitted by Scott Thomas to the QuakeStories website.
Summary of oral history interview with Guinevere Eves-Newport about her experiences of the Canterbury earthquakes.
A story submitted by Sophie to the QuakeStories website.
This thesis investigates life-safety risk in earthquakes. The first component of the thesis utilises a dataset of earthquake injuries and deaths from recent earthquakes in New Zealand to identify cause, context, and risk factors of injury and death in the 2011 MW6.3 Christchurch earthquake and 2016 MW7.8 Kaikōura earthquake. Results show that nearly all deaths occurred from being hit by structural elements from buildings, while most injuries were caused by falls, strains and being hit by contents or non-structural elements. Statistical analysis of injured cases compared to an uninjured control group found that age, gender, building damage, shaking intensity, and behaviour during shaking were the most significant risk factors for injury during these earthquakes. The second part of the thesis uses the empirical findings from the first section to develop two tools for managing life-safety risk in earthquakes. The first tool is a casualty estimation model for health system and emergency response planning. An existing casualty model used in New Zealand was validated against observed data from the 2011 Christchurch earthquake and found to underestimate moderate and severe injuries by an order of magnitude. The model was then updated to include human behaviour such as protective actions, falls and strain type injuries that are dependent on shaking intensity, as well as injuries and deaths outside buildings. These improvements resulted in a closer fit to observed casualties for the 2011 Christchurch earthquake. The second tool that was developed is a framework to set seismic loading standards for design based on fatality risk targets. The proposed framework extends the risk-targeted hazard method, by moving beyond collapse risk targets, to fatality risk targets for individuals in buildings and societal risk in cities. The framework also includes treatment of epistemic uncertainty in seismic hazard to allow this uncertainty to be used in risk-based decision making. The framework is demonstrated by showing how the current New Zealand loading standards could be revised to achieve uniform life-safety risk across the country and how the introduction of a new loading factor can reduce risk aggregation in cities. Not on Alma, moved and emailed. 1/02/2023 ce
An edited copy of the pdf transcript of Laura's second earthquake story, captured by the UC QuakeBox Take 2 project. At the participant's request, parts of this transcript have been redacted. Interviewer: Jennifer Middendorf. Transcriber: Laura Moir.
A pdf transcript of Stephen Bourke's second earthquake story, captured by the UC QuakeBox Take 2 project. Interviewer: Lucy Denham. Transcriber: Lucy Denham.
A story submitted by Gabriel Pollard to the QuakeStories website.
A story submitted by Seth to the QuakeStories website.
A notice from CERA at the start of the Cathedral Square walkway, listing safety instructions and what to do in case of an earthquake.
A story submitted by Michael to the QuakeStories website.
A story submitted by Mike Williams to the QuakeStories website.
A story submitted by Bill Thew to the QuakeStories website.
Summary of oral history interview with Janelle Mackie about her experiences of the Canterbury earthquakes.
The Press Building in Cathedral Square missing the wrought iron at the top of the tower. It was removed after the 4 September earthquake for safety reasons.
A story submitted by Diane Bargas to the QuakeStories website.