A poster created by University of Canterbury students outlining their findings from examining SCIRT's approach to managing health and safety.
Christchurch earthquake events have raised questions on the adequacy of performance-based provisions in the current national building code. At present, in the building code the performance objectives are expressed in terms of safety and health criteria that could affect building occupants. In general, under the high intensity Christchurch events, buildings performed well in terms of life-safety (with a few exceptions) and it proved that the design practices adopted for those buildings could meet the performance objectives set by the building code. However, the damage incurred in those buildings resulted in unacceptably high economic loss. It is timely and necessary to revisit the objectives towards building performance in the building code and to include provisions for reducing economic implications in addition to the current requirements. Based on the observed performance of some buildings, a few specific issues in the current design practices that could have contributed to extensive damage have been identified and recommended for further research leading towards improved performance of structures. In particular, efforts towards innovative design/construction solutions with low-damage concepts are encouraged. New Zealand has been one of the leading countries in developing many innovative technologies. However, such technically advanced research findings usually face challenges towards implementation. Some of the reasons include: (i) lack of policy requirements; (iii) absence of demonstrated performance of new innovations to convince stakeholders; and (iv) non-existence of design guidelines. Such barriers significantly affect implementation of low damage construction and possible strategies to overcome those issues are discussed in this paper.
An infographic giving statistics on workers arriving in Canterbury from overseas.
A paper which indexes standard SCIRT details and CSS details including all SCIRT details.
An extract from SCIRT's Alliance Agreement, detailing the terms of compensation.
A photograph captioned by BeckerFraserPhotos, "The site of the demolished Piko Cafe, now operating just from the new piece on the left. Corner of Kilmore and Barbadoes Streets".
A photograph captioned by BeckerFraserPhotos, "A new building replacing a damaged and demolished historic hotel at 192 Moorhouse Avenue".
An entry from Ruth Gardner's Blog for 16 November 2013 entitled, "Mother Mary".
A pdf copy of a work notice issued by SCIRT giving an overview of the Beachville Road seawall rebuild project.
A photograph of people looking at a sculpture under construction for the Pavilions & Lighting Devices night market, which is part of LUXCITY.
A photograph of the construction of Illusions taking place on an empty site on Gloucester street. The installation is part of LUXCITY.
Wood and pink insulation batts on Canterbury Street in Lyttelton. This construction material has been stripped from the exterior of a house.
Fletcher Construction says it may take years to repair an estimated 50-thousand homes in Canterbury following the September 4th earthquake.
A photograph of the construction of Illusions taking place on an empty site on Gloucester street. The installation is part of LUXCITY.
A photograph of the construction of Illusions taking place on an empty site on Gloucester street. The installation is part of LUXCITY.
A photograph of scaffolding and construction hoardings around the McKenzie & Willis building on the corner of High Street and Tuam Street.
A document which describes development and success of the SCIRT commercial model.
An award application for the Civil Contractors NZ Hirepool Construction Excellence Awards 2015 which details Downer's approach to repairing the Armagh Street bridge.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men put the walls together.
A volunteer on top of one of the Pallet Pavilion walls during construction. Scaffolding has been constructed around the wall out of wood.
A volunteer on top of one of the Pallet Pavilion walls during construction. Scaffolding has been constructed around the wall out of wood.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer putting the roof together.
A paper presented at the New Zealand Concrete Industry Conference 2015 about the design and construction challenges faced when strengthening the Memorial Arch.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Three volunteers putting the roof together.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men nail the walls together.
A construction site on Wakefield Avenue in Sumner that has been red-stickered due to rock fall danger from the cliff behind it.
A building under construction on Colombo Street in Sydenham. In the distance, two murals can be seen on the sides of a building.
A construction site on Wakefield Avenue in Sumner that has been red-stickered due to rock fall danger from the cliff behind it.
A video of an interview with Earthquake Recovery Minister Gerry Brownlee and Frank Delli Cicchi, the Grand Central Group Australian and New Zealand general manager, about the demolition of the Hotel Grand Chancellor. The Grand Chancellor is the tallest building in Christchurch, and was severely damaged during the 22 February 2011 earthquake. Fletcher Construction have been chosen to demolish the building.
Exploring women’s experiences of entering, working in, or leaving the Christchurch construction industry between 2010 and 2018 led to the creation of the theory of “deferential tailoring.” Deferential tailoring explains how women shape their responses to industry conditions as an intentional behavioural adjustment process. Most importantly, this theory provides insight into women’s unseen efforts to build positive workplace relationships, their capability to advance, and challenges to existing views of gender roles in this context. Research on women in construction focusses primarily on identifying and explaining barriers that impact on women’s entry, progression, and retention in the industry. There is an absence of process studies that explain the actions women take to manage industry conditions in business-as-usual, let alone post-disaster contexts. In the eight years following the 2010 Canterbury (New Zealand) earthquakes, rapid changes to the construction industry meant women had unprecedented access and new opportunities in this historically male-dominated domain. This setting provided a unique context within which to investigate how women respond to industry opportunities and challenges. The aim of this interpretive research was to construct a response theory, particular to women working in the Christchurch construction industry. Applying a constructivist grounded theory approach, theoretical sampling, coding and memo writing allowed for the collection and comparative analysis of 36 semi-structured interviews conducted with women working in a cross-section of industry occupations. Three inter- related categories were built: capitalising on opportunity, building capability and token tolerance, which together constitute the deferential tailoring process. Akin to building an invisible glass scaffold, women intentionally regulate their behaviours to successfully seize opportunities and manage social challenges. In building this scaffold, women draw heavily on personal values and positive, proactive attributes as a response to industry conditions. In contrast to previous research, which suggests that women conform to the male-dominated norms of the industry, the theory of deferential tailoring proposes that women are prepared to regulate their behaviour to address the gendered norms that impact on their work experiences. This research contributes towards an evolving body of knowledge that aims to understand how women’s entry into the construction industry, retention, and workplace relationships can be improved. By expanding the view of how women respond to industry conditions over time, this research has generated knowledge that addresses gaps in construction industry literature relating to the management of coping strategies, capitalising on opportunities, and building positive workplace relationships. Knowledge and concepts generated from this research could be integrated into recruitment and training programmes to enhance women’s professional development, shift perceptions of women’s work, and address cultural norms that impact on women’s retention in the construction industry.