25 May 2012. File reference: CCL-2012-05-25-IMG_3088 From the collection of Christchurch City Libraries.
The Bridge of Remembrance, which is unsafe and has been fenced off after the 22nd of February earthquake.
20130808_2293_1D3-40 New Brighton bridge Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage. #4074
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
20130808_2296_1D3-40 New Brighton bridge Prior to the earthquakes the stone wall at right was near road level. Now it is about 1.5m (4-5ft) lower. #4075
20130808_2298_1D3-40 New Brighton bridge Eighty years and then the damage was done. Result of the earthquake on 22/02/11. #4076
None
None
After the earthquake.
None
None
At the end of the street where my daughter and family live.
6 March 2012. File reference: CCL-2012-03-06-AroundChristchurch-IMG_0129 From the collection of Christchurch City Libraries.
Scaffolding surrounds the Bridge of Remembrance on Cashel Street.
Photograph captioned by BeckerFraserPhotos, "Avon River near the Anzac Drive bridge".
A photograph of the Medway Street bridge.
A photograph of the Medway Street bridge.
A photograph of the Avon River near Victoria Square, looking towards the Hamish Hay Bridge.
People examine large cracks running through the surface of Bridge Street on the approach to the bridge.
Photograph captioned by BeckerFraserPhotos, "Anzac Drive Bridge".
Photograph captioned by BeckerFraserPhotos, "Gayhurst Road Bridge".
A stone clock tower on the cliffs near Ferrymead.
A photograph looking west down Armagh Street from the bridge near Oxford Terrace.
A photograph of the repaired Kaiapoi River footbridge, also known as Mandeville Bridge. This photograph was modelled off an image taken by a staff member from the Department of Civil and Natural Resources Engineering at the University of Canterbury in September 2010.
A series of communication updates provided by SCIRT's Downer Delivery Team to the Christchurch City Council. These updates detailed the progress of the Arch and Bridge restoration. The updates were produced between 28 June 2013 and 8 September 2015.
Removal of the earthquake damaged footbridge over the Avon at Medway Street. Tuesday 12 February 2013. File reference: CCL-2013 -02-12-untitled6.bmp From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street. Tuesday 12 February 2013. File reference: CCL-2013 -02-12-untitled7.bmp From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street. Tuesday 12 February 2013. File reference: CCL-2013 -02-12-untitled8.bmp From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street. Tuesday 12 February 2013. File reference: CCL-2013 -02-12-untitled3.bmp From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street. Tuesday 12 February 2013. File reference: CCL-2013 -02-12-untitled.bmp From the collection of Christchurch City Libraries.