A gap between two walls at Halswell Primary School. The gap was caused by two buildings separating during the 4 September earthquake.
A gap between the house and the foundations along Avonside drive caused when the house was lifted during the 4 September earthquake.
A view across Robson Avenue in Avonside to a kerb that has collapsed as a result of the 4 September 2010 earthquake.
Photograph captioned by BeckerFraserPhotos, "People outside the Canterbury Museum. The Museum re-opened to the public on 4 September, 2011".
A footpath on Galbraith Avenue in Avonside showing cracking from the 4 September 2010 earthquake. Behind it, Sullivan Park can be seen.
Blade Runners Hair Design on Hills Road in Edgeware. The veranda collapsed during the 4 September earthquake, bringing down the parapet as well.
A photograph of a crack across a field indicating the location of the Greendale fault line which caused the 4 September 2010 earthquake.
Stonework from St John's Anglican Church where it fell during the 4 September earthquake. It is October and the daffodils have almost died.
A plan which describes how SCIRT will carry out design work. The first version of this plan was produced on 1 September 2011.
Christchurch Central City - 29 September 2013 File reference: CCL-2013-09-29-Lost-in-Central-City-DSC_0958.JPG Photo by Valerie Livingstone.
A colour photograph of details on the north side of the Lyttelton Times Building on Gloucester Street, taken after the 4 September 2010 earthquake.
The historic Kaiapoi Railway Station building, which can be seen leaning towards the river. Its foundations were damaged in the 4 September 2010 earthquake.
Photograph captioned by BeckerFraserPhotos, "The conical top of the tower at the Arts Centre was removed and secured after the September earthquake".
Bare patches of ground at Sullivan Park in Avonside. The bare patches mark where liquefaction covered the grass after the 4 September 2010 earthquake.
A house on Avonside Drive that has been abandoned due to damage from the 4 September 2010 earthquake. Its front garden has become overgrown.
A photograph of a building on Worcester Street which suffered fire damage when an electrical fire broke out after the 4 September 2010 earthquake.
An entry from Deb Robertson's blog for 7 September 2014 entitled, "A Catnap in Triton Cove...."The entry was downloaded on 3 November 2016.
A document which details the agreement in September 2013 between the Government and the Christchurch City Council over governance of the horizontal infrastructure rebuild.
An entry from Deb Robertson's blog for 4 September 2013 entitled, "We've been living our new life post earthquake for three years now....".
An entry from Deb Robertson's blog for 21 September 2015 entitled, "Living with tics {by Reuben}".The entry was downloaded on 2 November 2016.
Aftermath of September 4th Earthquake in Canterbury (area covers Christchurch City) NZ. Damage to bridge on Spencerville Road crossing the Lower Styx river.
The now vacated Christchurch City Council building suffered some damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The now vacated Christchurch City Council building suffered some damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
File Reference: CCL-CE-2013-09-30-EQNZ-2010.JPG Photo taken by G. Coster From the collection of Christchurch City Libraries
Photograph captioned by BeckerFraserPhotos, "Avonside Drive. The swimming pool is still sitting above ground, where the earthquake lifted it back in September, 2010".
A view across the intersection of Cranford and Winchester Streets to a block of shops that have been demolished following the 4 September 2010 earthquake.
A photograph submitted by Bettina Evans to the QuakeStories website. The description reads, "The beginning of the end for the Lyttelton museum, September 2011.".
A view down Robson Avenue in Avonside showing damage to the road surface and the footpath that has resulted from the 4 September 2010 earthquake.
Cracking in the brickwork of an archway on Manchester Street. This type of cracking was common in the Central City after the 4 September earthquake.
A plan which outlines the principles and methodology for the development of projects. The first version of this plan was produced on 20 September 2011.