More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
During the Christchurch earthquake of February 2011, several midrise reinforced concrete masonry (RCM) buildings showed performance levels that fall in the range of life safety to near collapse. A case study of one of these buildings, a six-story RCM building deemed to have reached the near collapse performance level, is presented in this paper. The RCM walls on the second floor failed due to toe crushing, reducing the building's lateral resistance in the east–west direction. A three-dimensional (3-D) nonlinear dynamic analysis was conducted to simulate the development of the governing failure mechanism. Analysis results showed that the walls that were damaged were subjected to large compression loads during the earthquake, which caused an increase in their in-plane lateral strength but reduced their ductility capacity. After toe crushing failure, axial instability of the model was prevented by a redistribution of gravity loads. VoR - Version of Record
This paper presents the ongoing development of a new 3D seismic velocity model of Canterbury, New Zealand. The model explicitly represents the Canterbury sedimentary basin, and other significant geologic horizons, which are expected to have important implications on observed ground motions. The model utilizes numerous sources of data, including 3D regional tomography with a variable-depth inferred Moho, seismic reflection survey lines, geotechnical boreholes and well logs, spectral analysis of surface waves, and CPT logs which provide velocity constraints over their respective ranges of application. The model provides P- and S-wave velocity and density (i.e. Vp, Vs and p) over a grid of input points, and is presently being utilized in broadband ground motion simulations of the 2010-2011 Canterbury earthquakes. Comparison of simulated ground motions with those observed in the 2010-2011 Canterbury earthquakes will help provide a better understanding of the salient physical processes which characterized the unique set of strong ground motions recorded in this sequence of earthquake events.
The Canterbury earthquakes, which involved widespread damage in the February 2011 event and ongoing aftershocks near the Christchurch central business district (CBD), presented decision-makers with many recovery challenges. This paper identifies major government decisions, challenges, and lessons in the early recovery of Christchurch based on 23 key-informant interviews conducted 15 months after the February 2011 earthquake. It then focuses on one of the most important decisions – maintaining the cordon around the heavily damaged CBD – and investigates its impacts. The cordon displaced 50,000 central city jobs, raised questions about (and provided new opportunities for) the long-term viability of downtown, influenced the number and practice of building demolitions, and affected debris management; despite being associated with substantial losses, the cordon was commonly viewed as necessary, and provided some benefits in facilitating recovery. Management of the cordon poses important lessons for planning for catastrophic urban earthquakes around the world.
None
None
Three years on from the earthquakes of 2011, Census data now confirms massive changes to the face and shape of Christchurch.
Forty law students in Christchurch are volunteering their time to help local residents take the Earthquake Commission to the High Court.
A photograph of Kristy Constable-Brown taken by Abi Keene as part of the "Biography, photography and women's earthquake stories" project.
An entry from Jennifer Middendorf's blog for 4 September 2014 entitled, "Four".
An entry from Ruth Gardner's Blog for 10 February 2014 entitled, "Garnished Gambling".
An entry from Ruth Gardner's Blog for 24 July 2014 entitled, "Tall Trees".
An entry from Ruth Gardner's Blog for 13 June 2014 entitled, "Stencilling Students".
An entry from Roz Johnson's blog for 19 January 2014 entitled, "New Brighton".
The Christchurch earthquakes brought to an abrupt halt a process of adaptive reuse and gentrification that was underway in the south eastern corner of the central business district. The retail uses that were a key to the success of this area pre-earthquake could be characterised as small, owner operated, quirky, bohemian, chaotic and relatively low rent. This research reports on the progress of a long term, comprehensive case study that follows the progress of these retailers both before and after the earthquakes. Findings include the immediate post-earthquake intentions to resume business in the same location as soon as possible were thwarted by government imposed cordons of the CBD that were only lifted nearly three years later. But, businesses were resilient and generally reinvented themselves quickly in alternative suburban locations where government “rebuild” restrictions were absent. It remains to be seen if this type of retail will ever return to the CBD as government imposed plans and the rents demanded for retail space in new buildings appear to preclude small owner-operated businesses.
External stairs on the Forsyth Barr building in Christchurch. Portions of the internal stairwell collapsed during the earthquake of February 22nd 2011, necessitating use of various means of getting people out of the building. Was the fourth highest building in the city pre earthquakes, but it's future is uncertain. Was for sale "as is, where ...
A story submitted by Sue Hamer to the QuakeStories website.
Nine to Noon has been told that the Ministry of Business, Innovation and Employment is leading a multiagency group - including the Earthquake Commission, Fletcher Construction's EQR and the Department of Prime Minister and Cabinet - to try to identify which houses may have have had a high risk of containing asbestos and thereby quantify how many people may have been exposed. With Graham Darlow, Chief executive of Fletcher Construction and Gerry Brownlee, Minister for Canterbury Earthquake Recovery.
An historic Christchurch clock tower damaged in the earthquakes was unveiled today, after undergoing more than eight hundred thousand dollars of repairs.
A story submitted by Anonymous to the QuakeStories website.
A Christchurch resthome under stress after the earthquakes is being blamed for systemic failures that ended in a frail elderly woman dying.
Prime Minister, John Key, denies money is being held back from the Canterbury earthquake recovery to make the Government's books look better.
A photograph of Danielle Louise O'Halloran taken by Gemma Coutts as part of the "Biography, photography and women's earthquake stories" project.
A story submitted by Melissa to the QuakeStories website.
Work to restore one of Christchurch's most recognisable heritage buildings can now begin with the help of a grant from the Earthquake Appeal Trust.
None
Three years on from the February 22nd Christchurch earthquake hundreds of businesses are still waiting for their insurance claims to be settled.
The Earthquake Recovery Minister, Gerry Brownlee, has described a 'state of the city' speech by the Christchurch mayor, Lianne Dalziel, as deeply disappointing.
A Christchurch couple fighting their insurer and the Earthquake Commission in court say accepting EQC's offer would leave them massively out of pocket.
Official figures show the Christchurch City Council's legal bill to settle its earthquake insurance claims is sitting at nine million dollars, and climbing.